My WebLink
|
Help
|
About
|
Sign Out
RES 87499
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87499
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2012 10:42:33 AM
Creation date
12/7/1999 12:49:23 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/17/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File No. C6-2487-R1 <br /> November 9, 1987 <br /> <br />This estimate presumes that the City staff will be cooperative in assisting us <br />to gather and correlate the available data on this site. Actual fees will <br />charged on the basis of the hourly rates and unit prices listed in the <br />attached Fee Schedule (3/87). The designated representative of the City of <br />Pleasanton will be kept constantly appraised of our findings so that if <br />changes in the above scope of work are required, a modification to our <br />agreement can be arranged. <br /> <br />We understand your concern regarding this project, and your desire to <br />proceed with dispatch. We anticipate that we could begin work on the project <br />within 3 to 5 days of receiving your verbal authorization to proceed. The <br />work on the project would be spaced out so that the results from each stage <br />could be analyzed prior to proceeding with the next stage. In that way we <br />would hope to keep the costs to a minimum and avoid performing unnecessary <br />work. <br /> <br />If this proposal is satisfactory, and you wish us to proceed with the proposed <br />study, please sign and return one copy of the enclosed Work Order or send <br />us a copy of the contractual agreement that you would prefer to use. If you <br />have any questions regarding the scope of the proposed study, the <br />anticipated time frame to complete the work, the estimated fees, or any other <br />concern, please contact one of the undersigned. We would be grateful to <br />have the opportunity to discuss your concern with you. <br /> <br />Very truly yours, <br /> <br />EARTH SYSTEMS CONSULTANTS <br /> <br />Richard T. Gomm, Vice President Bruce O'Neill, Project Engineer <br /> <br />BON/RTG/ML :bon <br />Distribution: 4 to the City of Pleasanton <br /> <br />Enclosures: Fee Schedule (3/87) <br /> / Work Order <br /> ~ ' General Conditions <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.