Laserfiche WebLink
withhold building permits if the City determines that sufficient water is not available at <br />the time of application of building permits. <br />Planning Requirements: <br />31. The project developer shall survey the building pad heights to verify their conformance to <br />the approved building pad elevations on Exhibit "A". Said verification shall be <br />performed by a licensed land surveyor or civil engineer, and shall be completed and <br />provided to the Planning Department before the building foundations/slabs are formed. <br />32. The project developer shall survey the heights of the structures to verify their <br />conformance to the approved building height as shown on Exhibit "A". Said verification <br />shall be performed by a licensed land surveyor or civil engineer, and shall be completed <br />and provided to the Planning Department before the first framing or structural inspection <br />of each building on each lot by the Building Department. <br />33. The homes covered by this approval shall be constructed to encourage telecommuting by <br />providing as an option telecommunications infrastructure consistent with state-of--the-art <br />methods at the time that the homes are submitted for site-specific design review approval. <br />34. A list of all green building measures used in the design of the home(s) shall be provided <br />for the review and approval of the Planning Director with the application for design <br />review approval for the home(s). Each home shall be designed to include a minimum of <br />50 points using the ACWMA's Green Points rating system with a minimum often points <br />in each category (Resources, Energy, and IAQ/Health). <br />35. The project developer shall submit a waste management plan to the Building Department <br />prior to issuance of building or demolition permits. The plan shall include the estimated <br />composition and quantities of waste to be generated and how the project developer <br />intends to recycle at least 50-percent of the total job site construction and demolition <br />waste measured by weight or volume. Proof of compliance shall be provided to the Chief <br />Building Official prior to the issuance of a final building permit. During demolition and <br />construction, the project developer shall mark all trash disposal bins "trash materials <br />only" and all recycling bins "recycling materials only". The project developer shall <br />contact Pleasanton Garbage Service for the disposal of all waste from the site. <br />36. Trellis-covered arbors and/or porches up to a height of 15-feet supporting photovoltaic <br />panels shall be exempt from the City's Administrative Design Review procedures. <br />Design review at the Planning staff level and building/electrical permits would still be <br />required. <br />