Laserfiche WebLink
21. The project developer may install aseven-foot tall masonry wall or enhanced wood fence <br />on the west (abutting the Palmer Drive properties), north (abutting the Trenery Drive <br />properties), and east (abutting the Martin Avenue/Diablo Court, and Leuthauser property) <br />project bomrdaries of the overall development covered by this approval, and may install a <br />seven-foot tall masonry wall or enhanced wood fence "returns" at Lot 9 and Lot 19 <br />facing Cameron Avenue between the house and perimeter boundary. However an <br />enhanced wood fence is required on and between Lots 10 and 18 facing Cameron Avenue <br />at the fence returns. The project developer shall submit a comprehensive fencing plan in <br />conformance to Exhibit A with the masonry wall designs with the tentative map <br />application for review and approval by the Planning Commission. <br />22. The project developer may incorporate minor perimeter boundary adjustments along the <br />north and east project boundaries adjoining the Wiemken, Larson, and Selway properties <br />generally consistent with Exhibit A in the tentative subdivision map, grading plan, and <br />utility plan with the concurrence of said adjoining property owner(s) and subject to the <br />approval of the Planning Director, provided that the adjustments are intended to improve <br />the setbacks of the existing accessory structure and trees on said properties or to <br />accommodate the new perimeter wall/fence alignment. <br />23. Thirty days before grading begins, the project developer shall have the site surveyed by a <br />licensed biological consultant for the presence of Burrowing Owls and nesting raptors. If <br />these species are present, the project developer shall not begin grading and shall submit a <br />mitigation plan to the Planning Director for implementation. <br />General Conditions: <br />24. The project developer shall obtain a Building Permit from the Building and Safety <br />Division for the structures covered by this approval and any other applicable City permits <br />for the project prior to the commencement of any construction. <br />25. Prior to issuance of a building permit, the project developer shall pay the applicable Zone <br />7 and City connection fees and water meter cost for any water meters, including irrigation <br />meters. Additionally, the project developer shall pay any applicable Dublin San Ramon <br />Services District (DSRSD) sewer permit fee. <br />26. This development plan shall be of no further validity and the project developer shall be <br />required to submit the same or new development plan for City approval prior to <br />development of the site in the event that the project developer fails to record a final map <br />within two years of PUD approval. <br />27. The project developer acknowledges that the City of Pleasanton does not guarantee the <br />availability of sufficient sewer capacity to serve this development by the approval of this <br />case, and that the project developer agrees and acknowledges that building permit <br />approval may be withheld if sewer capacity is found by the City not to be available. <br />