Laserfiche WebLink
Page Two <br /> September 18, 1987 <br /> Job No. 1124.300 <br /> <br /> 1. Review of final grading plans and specifications. <br /> <br /> 2. As needed, provide consultation during the construction <br /> operations. <br /> <br /> 3. On a full-time basis, observe the placement and perform <br /> density tests on the compaction of fill materials within <br /> the channel grading operations. <br /> <br /> 4. Prepare concrete cylinders and provide compression testing <br /> of the concrete material used in the storm drain pipe <br /> construction. <br /> <br /> 5. On a part-time basis, observe the placement and perform <br /> density tests on the compaction of materials during the <br /> backfilling of the storm drain trench. <br /> <br /> 6. On a part-time basis, observe and perform subgrade <br /> preparation density tests on the prepared subgrade in the <br /> access road. <br /> <br /> 7. On a part-time basis, observe the placement and perform <br /> density tests on the aggregate base rock in the access <br /> road. <br /> <br /> 8. As needed, perform laboratory tests on representative <br /> samples of the fill, backfill, and import materials to <br /> support the field operations. <br /> <br /> Results of our observations and tests will be made available to <br /> the contractor on the site so that timely, corrective action <br /> might be taken as necessary. Upon completion, we will summarize <br /> our observations and test results in a report. <br /> <br /> FEE AGREEMENT <br /> <br /> We will provide our services on a time-and-expense basis in <br /> accordance with the attached Fee Schedule - 1987, which is made a <br /> part of this agreement by reference. We will reduce our services <br /> for Senior Engineering Technician from $64.00 to $50.00 an hour <br /> for this project. You have requested that we prepare an estimate <br /> based on the following: <br /> <br /> A. Three (3) weeks for channel grading (full-time). <br /> <br /> B. Three (3) weeks during concrete placement, trench <br /> backfill and access road subgrade and base rock <br /> operations (part-time). <br /> <br />· I~EaLOGAR GEOT~CHI~IICAL CONSULTAI~ITS <br /> <br /> <br />