Laserfiche WebLink
Page Three <br /> September 18, 1987 <br /> Job No. 1124.300 <br /> <br /> Cost for this would break down roughly as follows. <br /> <br /> 1. Consultation <br /> <br /> Prior to and during construction $500 <br /> operations <br /> <br /> 2. Laboratory Testing 1,500 <br /> 3. Post-Construction <br /> <br /> Report, with field and 500 <br /> laboratory data <br /> <br /> Total $2,500 <br /> Typical weekly charges during channel construction: <br /> <br /> 4. Field Technician, 40 hrs @ $50 2,000 <br /> Field Supervision, 4 hrs @ $75 <br /> 300 <br /> Mileage, 100 miles @ $0.35/mile 35 <br /> Nuclear Gauge, 40 hrs @ $6 240 <br /> <br /> Weekly Total 2,575 <br /> 3 Weeks 7,725 <br /> <br /> Typical weekly charges during concrete pavement, trench backfill <br /> and access road construction: <br /> <br /> 5. Field Technician, 18 hrs @ $50 900 <br /> Field Supervisor 3 hrs @ $75 225 <br /> <br /> Mileage, 100 miles @ $0.35/mile 35 <br /> Nuclear Gauge, 15 hrs @$6 90 <br /> <br /> Weekly Total 1,250 <br /> <br /> 3 Weeks $3,750 <br /> <br /> APPROXIMATE BUDGET TOTAL $14,000 - 15,000 <br /> <br /> We have assumed an 8-hour work day; overtime will result in <br /> additional charges. In addition, it does not include show-up <br /> time when our field technician is scheduled for the project and <br /> the contractor cancels work without adequate notice. We have a <br /> three-hour minimum charge. <br /> <br />BE R. LOGAR GEOTECH N ICAL CONSULTANTS <br /> <br /> <br />