Laserfiche WebLink
<br />. IsabeVRoute 84 widening to 4 lanes from Pigeon Pass to Stanley, and 6 lanes from <br />Stanley to 1-580 <br />. Dublin Boulevard extension to Live/lTlore as 6-lane divided roadway with a 4-lane <br />section through the unincorporated area. <br />. Jack London extension to EI Charro Road as a 4-lane roadway. <br />. EI Charro Road widening to 6 lanes from 1-580 to Jack London <br />. East Dublin Properties roadway network <br />. New Livermore General Plan roadway network including only 2 lanes on First Street <br />through downtown <br />. An HOV lane on north 680 from Milpitas to SR 84 - Caltrans planned improvement <br /> <br />Pleasanton Roadway network changes assumed over the next 20 years: <br />. 17 New Traffic Signals at the following intersections: <br />o Bernal Avenue at 1-680 southbound ramps <br />o Bernal Avenue at Kottinger Drive <br />o Bernal Avenue at Main Street <br />o Bernal Avenue at Nevada Street <br />o Hopyard Road at Del Valle Parkway <br />o Santa Rita Road at Francisco Street <br />o Stoneridge Mall Road at Deodar Way <br />o Stoneridge Mall Road at Embarcadero Court <br />o Sunol Boulevard at Castlewood Drive <br />o Sunol Boulevard at 1-680 northbound <br />o Sunol Boulevard at 1-680 southbound <br />o Valley Avenue at KolI Center south <br />o Valley Avenue at Paseo Santa Cruz north <br />o Valley Avenue at Paseo Santa Cruz south <br />o West Las Positas Boulevard at Muirwood Drive <br />o West Las Positas Boulevard at Payne Road <br /> <br />. Significant intersection changes: <br />o Bernal Avenue at Angela Street - right turn only from Angela during peak hours <br />o Bernal Avenue at Meadowlark widening associated with Arroyo Del Valle <br />bridge widening <br />o Bernal Avenue at Puerto Vallarta - right turns only from Puerto Vallarta during <br />peak hours <br />o Bernal Avenue at Vineyard Avenue widening associated with Arroyo Del Valle <br />bridge widening <br />o First Street at Vineyard/Ray - convert east/west to protected/permissive left <br />turn phasing <br />o Foothill Road at Canyon Way - convert #1 southbound through into third left <br />turn lane, restripe eastbound to create triple left turn, widen eastbound Canyon <br />Way to receive traffic from three left turn lanes <br />o Foothill Road at Deodar Way - remove crosswalk on Foothill <br />o Foothill Road at Laurel Creek Way - remove crosswalk on Foothill <br />o Foothill Road at Stone ridge Drive - unsplit east/west signal operations and <br />convert the #1 southbound through into a third southbound left turn lane <br />o Deodar Way - remove north crosswalk <br />o Hacienda Drive at 1-580 eastbound - modify signal and striping to convert #2 <br />left turn to a leWright option lane <br /> <br />Special City Council Meeting <br />Minutes <br /> <br />3 <br /> <br />August29,2006 <br />