My WebLink
|
Help
|
About
|
Sign Out
CCMIN030105
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
2000-2009
>
2005
>
CCMIN030105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2007 10:56:41 AM
Creation date
3/30/2005 10:56:20 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
3/1/2005
DOCUMENT NO
CCMIN030105
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If Council directed staff to proceed with a public restroom facility at Delucchi <br />Park, Mr. Fialho said staff would work to get it done and bring back a conceptual design <br />and design specifications as soon as possible. He pointed out that the public restroom <br />facilities that are included in the Downtown Trails Master Plan are conceptual in terms of <br />location and size. Therefore, he suggested that Council consider all three potential <br />sites, which would include the location, the size and the elements, and at that point in <br />time, Council could make a decision as to where it wanted to locate public restroom <br />facilities. <br /> <br /> Mr. Sullivan concurred with Mr. Fialho's suggestion. He was not sure that <br />Delucchi Park or Lions Wayside Park are the proper locations for public restroom <br />facilities. <br /> <br /> Ms. McGovern noted that the Firehouse Arts Center proiect would take longer to <br />complete than constructing a public restroom facility at Delucchi Park. She stated that <br />she would like to have a public restroom facility constructed within one year. She asked <br />if the motion included diaper-changing stations? <br /> <br /> Mayor Hosterman said yes. <br /> <br /> Mr. Fialho clarified that part of what staff would bring back to Council is options, <br />construction estimates and a construction timeline for each of the alternatives. <br /> <br /> Mr. Sullivan requested that staff provide some type of conceptual description for <br />each location. <br /> <br /> Ms. McGovern requested staff to consider four different areas throughout the <br />downtown so that they are spread out. <br /> <br />The roll call vote was taken as follows: <br />AYES: Councilmembers - Brozosky, McGovem, Sullivan, and <br /> Mayor Hosterman <br />NOES: None <br />ABSENT: None <br />ABSTAIN: None <br /> <br /> It was moved by Mr. Brozosky, seconded by Mr. Sullivan, to adopt <br />Resolution 05-013, a resolution accepting the design review application subject to <br />the conditions of approval, with the removal of the public restroom facility. <br /> <br />The roll call vote was taken as follows: <br />AYES: Councilmembers - Brozosky, McGovern, Sullivan, and <br /> Mayor Hosterman <br />NOES: None <br />ABSENT: None <br />ABSTAIN: None <br /> <br /> There was a break at 8:52 p.m. <br /> <br /> The meeting reconvened at 9:01 p.m. <br /> <br />Pleasanton City Council 11 03/01/05 <br />Minutes <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.