My WebLink
|
Help
|
About
|
Sign Out
CCMIN061802
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
2000-2009
>
2002
>
CCMIN061802
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2007 10:56:35 AM
Creation date
8/8/2002 2:58:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
6/18/2002
DOCUMENT NO
CCMIN061802
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reasonable amount of time has been spent on the mitigation plan. There is an item on the next <br />Council agenda for paving a portion of the Arroyo Mocho in pursuing the trails to school plan. <br />That work is scheduled to be done this summer. Obviously, it will not be open to the public <br />during that time. In conjunction with that, staff will be working with Zone 7 to resolve the gates <br />issues, and once that section is complete, the trails can be opened all the way to Stoneridge. <br /> <br /> Ms. Michelotfi referred to the increased use of drought resistant plantings. She expressed <br />concern about the loss of greenery particularly on West Las Positas between Hopyard and the <br />West Las Positas overcrossing of 1-680 or Muirwood Drive. She felt this area looks bad. <br /> <br /> Mr. Wolfe said the Parks and Recreation Commission has become an advocate for <br />medians. In the past more focus was on parks at the expense of the medians. There are many <br />more median projects currently. He related various pending projects. Part of the problem has <br />been that irrigation was on a manual system, which required a person to go out and turn on the <br />sprinklers. There are also problems due to the need for repairs to various systems. It is not a <br />question of using drought tolerant plantings, it is the state of the irrigation systems. That is a big <br />part of current median projects. <br /> <br />Ms. Dennis asked if there was a traffic signal planned for Kottinger and First Streets. <br /> <br />Mr. Bocian said yes. <br /> <br /> Ms. Michelotti asked if the pedestrian lights included a count-down and when the lights <br />would be installed. She also asked about lighted crosswalks. <br /> <br /> Mr. Lum indicated the poles would go up very soon and would be turned on in about a <br />month. There will be no lighted crosswalks, but he believed there was a countdown signal for <br />pedestrians. <br /> <br /> Ms. Michelotti said there is a $2 million reserve for the Vineyard Corridor and there is <br />also a funding mechanism for $2 million. She asked for an explanation of that. <br /> <br /> Ms. McKeehan said the financing plan calls for $2 million in cash and bond funding of <br />$2 million, for a total of $4 million. It remains to he seen whether that will be the final plan. <br /> <br /> Mr. Swift explained that the Phase I Specific Plan shows a loop trail that uses the arroyos. <br />Council authorized a consultant to study modifying the channels to a more natural flowing <br />stream and to include trails along the side of the riparian environment. Applications for grant <br />funds have been authorized. The City is a semi-finalist for one grant and there have been site <br />visits for two other grants. He believed the loop trail along the entire B-2-1 channel would go in <br />with the stream improvements and other channels. It all depends on the grant money. There will <br />be trails on the central and west parcels along the railroad track and channels. <br /> <br />Vice Mayor Dennis declared the public hearing open. <br /> <br />Pleasanton City Council 8 06/18/02 <br />Minutes <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.