My WebLink
|
Help
|
About
|
Sign Out
CCMIN012301
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
2000-2009
>
2001
>
CCMIN012301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2007 10:56:33 AM
Creation date
2/20/2001 9:40:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
1/23/2001
DOCUMENT NO
CCMIN012301
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mayor Pico pointed out that there is a funding deficit for this project and he <br />would hate to see any additional negative impacts or delay of the project. He felt that <br />once the project is built and at some future date when the neighboring property is <br />developed and additional land is dedicated, there might be an opportunity to build a silo <br />at a place less visible. <br /> <br />Ms. Ayala said silos have to be built near the barn. <br /> <br /> Ms. Michelotti clarified that motion does not eliminate the silo but is to continue <br />to get community input about it. She asked Mr. Wolfe whether it was easier to get <br />historical certification for an object that is no longer there than for reconstructing one that <br />is not accurate. <br /> <br /> Mr. Wolfe said yes. Because the silo is no longer there, it is easier to get <br />acceptance than to try to rebuild it to a scale out of proportion with the other buildings on <br />the site. <br /> <br /> Ms. Ayala thought she had read that it was acceptable to build it lower so long as <br />it was twice the height of the barn roof. <br /> <br /> Ms. Garrett said the Secretary of the Interior standards are very strict about re- <br />creation or reconstruction. If the silo is rebuilt, it must be in proportion with the barn, or <br />about double the size. There are no drawings that specify the ham is 20'2" high and the <br />silo is 42'. The determinations of size have been estimated from photographs. After <br />much discussion about reducing the size of the silo, it was determined it could not be <br />below 39' for two reasons: they didn't want to look like Disneyland, and it would not be <br />proportionate to the barn at any lower level. <br /> <br /> Ms. Pattillo discussed the various heights of the silo and believed that the <br />substitute motion was to continue to study the issue to try and find a compromise that is <br />acceptable to the State and to the community. <br /> <br /> Ms. Ayala agreed and reiterated Ms. Dennis' comment that if the silo still existed, <br />people would object to its removal. She appealed to the rest of the citizens in the <br />community to allow recreation of something that is historic to the conununity. <br /> <br /> Ms. Michelotti wanted the vertical feature for the barn, but did not want it to be <br />39' or 40'. <br /> <br /> Ms. Dennis said that as much as she likes the idea of the silo, she appreciated all <br />the thought and effort to develop a plan that would be a certified historical site. She <br />cautioned Council about not honoring all the work that went into this. The silo can <br />always be brought back later if people decide they want it. The Master Plan can be <br />amended. However, at this meeting, she wanted to honor all the work that was done to <br />reach consensus for creation of a unique park, rather than put forth her own opinion. <br /> <br />Pleasanton City Council 11 01/23/01 <br />Minutes <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.