My WebLink
|
Help
|
About
|
Sign Out
CCMIN031594
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
1990-1999
>
1994
>
CCMIN031594
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 10:54:31 AM
Creation date
5/21/1999 11:13:32 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Roush suggested that Council request that this item be brought back to Council in <br />approximately 6 to 9 months for further consideration. This would allow enough time to <br />determine whether the blinking traffic signal and stop signs were having the desired effect. <br /> <br /> Mr. van Gelder stated that in order to get any results from studying this intersection, <br />Council would need to give it at least 3-6 months before reconsideration. <br /> <br /> It was decided that this item would be considered further in approximately 6 months. <br /> <br />6. MATYERS CONTINUED OF DECISION <br /> <br />Item 6a <br />Growth MariaCement ABoeations for the Robertson Homes Pro_i eet and for 1994 and FUtUre <br />Years (SR94: 90) <br /> <br /> Mr. Swift presented the staff report. <br /> <br /> Ms. Dennis asked Mr. Swift to expiain the current status of available sewer capacity for <br />the two proposed projects and how close the city is to the limit on sewage capacity. <br /> <br /> Mr. Swift explained there are two components: treatment and export. Export is the <br />biggest concern because it has to handle "peak weather" flows. Staff has estimated, assuming _. <br />worst case weather conditions, full build-out of approved projects, and full occupancy, that with <br />the present export system, the City would be close to export capacity in the year 2000. Staff <br />and DSRSD are researching ways to sWre treated export to allow a more managed flow. Also, <br />all projects have conditions that specifically state if sewage capacity is not available. building <br />permits will not be issued. Mr. Swift then explained more about the proposed storage facilities. <br /> <br /> In response to Mr. Pico, Mr. Swift provided the estimated number of very low-income, <br />low-income, and moderate income units where have been and intend to be, built. <br /> <br /> Mr. Pico was concerned that the potential increase in population in Pleasanton that will <br />be produced by the number of units approval by previous Councils will impact services already <br />provided to the community. <br /> <br /> Mr. Bocian stated that staffs task is to regularly evaluate the City's expenditures and <br />income to assure that it has the appropriate staffing and capital in place to meet the needs of the <br />public. _ <br /> <br /> Ms. Rossi explained projected budgets for the coming years and how the budget will be <br />managed to make sure there are no deficits. <br /> <br />03/15/94 4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.