Laserfiche WebLink
Task 3--Bid Period and Construction Period Assistance (Future <br />AuthorizatiOn) <br /> <br /> The following are general tasks anticipated for Bid Period <br />and Construction Period Assistance. Detailed task breakdowns will <br />be prepared at the time of detailed task preparation for Task 2, <br />Final Design. <br /> <br /> 3.1 Construction period Project Management. <br /> <br /> 3.2 Provide assistance to City during bid period. <br /> <br /> 3.3 Provide assistance to City during construction period. <br /> <br />II. SPECIAL ENGINEERING SERVICES <br /> <br /> Work that cannot be specifically defined at the time of <br />execution of the agreement, will be classified as Special <br />Engineering Services. The costs for Special Engineering Services <br />are not included in the cost ceiling for Article I, PLANNING <br />ENGINEERING SERVICES, and shall be negotiated and authorized <br />separately, if required. Possible categories of extra work <br />applicable to Preliminary Design Services which may be required <br />under Special Engineering Services are: <br /> <br /> 1. Aerial photography and mapping. <br /> <br /> 2. Additional surveying. <br /> <br /> 3. Environmental assessments. <br /> <br /> 4. Additional attendance at Public Meeting, beyond the <br /> one meeting included in the scope of work. <br /> <br /> 5. Extra copies of reports. <br /> <br /> Exhibit A <br /> City of Pleasanton <br /> January 21, 1988 <br /> Page 5 of 5 <br /> <br /> <br />