Laserfiche WebLink
19. That the haul route for all materials to and from this <br /> development be approved by the City Engineer prior to the start <br /> of any construction. The approved haul routeshall be noted on <br /> the tract improvement plans and on the building plans. <br /> <br />20. That the developer submit an erosion and sedimentation control <br /> plan or procedure as part of the improvement plans prior to the <br /> final approval of the development. <br /> <br />21. That the developer submit a dust control plan or procedure as <br /> part of the improvement plans prior to the final approval of the <br /> development. <br /> <br />22. That storm drainage swales, gutters, inlets, outfalls, and <br /> channels not within the area of a dedicated public street or <br /> public service easement approved by the City Engineer be <br /> privately maintained by the property owners or through an <br /> association approved by the City. <br /> <br />23. That approval of the water supply and distribution system be <br /> withheld pending final design and until the developer has <br /> demonstrated to the satisfaction of the City Engineer that the <br /> proposed system meets both the immediate and long-range <br /> requirements for supplying water in this area. <br /> <br />24. That the developer comply with any and all applicable <br /> requirements of the cross-connections control and backflow <br /> prevention device programs required by the California <br /> Administrative Code, Title 17. <br /> <br />25. That the developer pay the applicable Zone 7 and City connection <br /> fees and the meter cost prior to Council approval of the <br /> development for any water meters (irrigation meters) not directly <br /> related to a building permit. A complete list of the number, <br /> size, location of these meters shall besubmitted. <br /> <br />26. That approval for the number, type and location of fire hydrants <br /> be withheld pending final design, review by the Fire Marshal, and <br /> final review by the City Engineer. Blue reflective marker dots <br /> shall be installed on the finished street as required. <br /> <br />27. That approval of the sanitary sewer system be withheld pending <br /> final design and until the developer has demonstrated to the <br /> satisfaction of the City Engineer that the proposed system is <br /> adequate, connects to an approved point of discharge, and meets <br /> both the immediate and long-range requirements of the sanitary <br /> system in this and all tributary areas. <br /> <br /> <br />