Laserfiche WebLink
9. That in-lieu park dedication fees be collected by the City prior <br /> to approval of the final map at the rate then in effect and for <br /> the total number of lots in the final map, unless the developer <br /> demonstrate that this requirement has been otherwise satisfied. <br /> <br />10. That any existing assessment district, which the property may be <br /> subject to, be cleared prior to the approval of the final map or <br /> the developer will cause a segregation to be completed in <br /> conjunction with the final map. <br /> <br />11. That the developer submit a refundable cash bond for hazard and <br /> erosion control prior to approval of the final map. The amount <br /> of this bond will be determined by the City Engineer. <br /> <br />12. That the developer (subdivider) may file multiple final maps <br /> prior to the expiration of the conditionally approved tentative <br /> map for this development; provided, however, that each such final <br /> map filed shall provide for all normal and reasonable public <br /> improvements required by the City to serve that portion of this <br /> development to the satisfaction of the City Engineer. <br /> <br />13. That the developer dedicate to the City for street right-of-way <br /> purposes, those parcels of land intended to be public streets. <br /> <br />14. That the developer grant an easement to the City over those <br /> parcels shown as public service easements (P.S.E.) and which are <br /> approved by the City Engineer or other parcels which may be <br /> designated by the City Engineer. <br /> <br />15. That approval of the design for the line, grade, and structural <br /> sections for the streets serving this development be withheld <br /> pending final engineering design and review by the City Engineer. <br /> <br /> 16. That vertical P.C.C. curbs and gutters be constructed within this <br /> development unless otherwise approved by the City Engineer and <br /> that the curb and gutter be poured monolithically with the <br /> sidewalk when the sidewalk is adjacent. <br /> <br /> 17. That all existing wells, septic tanks or holding tanks on the <br /> site be properly sealed, filled and abandoned prior to the start <br /> of grading operations unless Zone 7 retains specific wells for <br /> observation wells, or special approval is obtained from the City <br /> Engineer for temporary use of an existing well for construction <br /> water. <br /> <br /> 18. Any wells designated for abandonment or any wells encountered <br /> during construction, are to be destroyed in accordance with a <br /> permit obtained from Zone 7 by calling (415) 443-9300. <br /> <br /> <br />