My WebLink
|
Help
|
About
|
Sign Out
RES 88286
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2012 12:29:21 PM
Creation date
12/3/1999 12:01:03 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/21/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
would require that exposed soil be wetted during construction <br />and the construction vehicles be kept in good operating <br />condition. ~. <br /> <br /> Neither the DEIR nor the Final EIR states that air <br />quality impacts of the Project are significant, and the DEIR <br />does not include the air quality impacts of the Project on <br />page 89 in the listing of significant unavoidable impacts of <br />the Project. <br /> <br /> 2. FindinGs. <br /> <br /> a. Based on the discussions at page 58 and <br /> <br />59 of the DEIR and the other facts referenced above, the City <br />Council finds that any change in air quality or overall <br />emissions as a result of the Project will be relatively small <br />and insignificant, and will not constitute a significant <br />adverse environmental impact of the Project. <br /> <br /> b. To the extent that air quality impacts <br />could be significant, the City Council finds that additional <br />Mitigation Measures 3 and 4 referenced above will substantially <br />reduce any air quality impacts, including cumulative impacts, <br />of construction and development pursuant to the Project. <br /> <br /> c. The City Council finds that the <br />above-stated mitigation measures shall become "Conditions of <br />Approval" to the Project, and, to the extent that any air <br />quality impacts of the Project could be significant, such <br />mitigation measures, Mitigation Measure 1 as described on <br />page 60 of the DEIR, other measures incorporated into this <br /> <br /> 17 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.