My WebLink
|
Help
|
About
|
Sign Out
RES 88227
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2012 4:45:03 PM
Creation date
12/2/1999 12:30:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/17/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job #8704139.40 BlSSELL & KARN. INC. <br />May 5, 1988 <br />Page 3 <br /> <br /> O Prepare a preliminary pump station layout. <br /> <br /> o Preliminary cost estimate and recommended cost allocation. <br /> <br /> o Summarize the results of the above in a brief report and review with <br /> City staff. <br /> <br />Task III. Preparation of Base Map. <br /> <br />We would survey the selected pump station site and locate all existing <br />facilities that would be impacted by the project. Based on the survey data <br />we would prepare a base map for use in detailed design. <br /> <br />Task IV. Pump Specification and Ordering. <br /> <br />As noted above, the intent of this task is to reduce the time required for <br />construction by ordering the pumps prior to award of the construction <br />contract. There would then be two contracts fo~ the total project then, one <br />to supply the pumps and the other to construct the pump station building, <br />install the pumps, and complete the piping, electrical and control systeM. <br />(Note: If it is determined in Task I that the project is not so urgent, this <br />task would be omitted and the pumps specified as part of the construction <br />contract. ) Specific tasks would be as follows: <br /> <br />o Preparation of detailed specifications for pre-ordering pumps. <br />o Assistance in obtaining bids. <br />o Answering questions from suppliers during the bidding period. <br />o Assistance in evaluation of the bids and contract award. <br />Task V. Detailed Design of Pump Station. <br /> <br />This task would include preparation of detailed plans and specifications, <br />coordiDation with the City, PG&E, and other agencies as necessary to <br />obtain the necessary approvals for the project. In addition to routine <br />coordination, reviews would be scheduled with the City at the 50%, 90% and <br />final completion points in the design. <br /> <br />At this point it is anticipated that the plans would consist of <br />approximately 8 sheets as follows: <br /> <br />WDP . 8 . 27 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.