Laserfiche WebLink
BISSELL & KARN. INC. <br />Sob #8704139.40 <br />May 5, 1988 <br />Page 4 <br /> <br /> Title Sheet and Site Plan <br /> Existing Pum~ Station Demolition Plan <br /> Structural Plans and Sections <br /> Structural Details <br /> Architectural and Landscaping Details <br /> Mechanical Plans and Sections <br /> Mechanical Details <br /> Electrical and Control Plan <br /> <br />Task VI. Bidding and Award ASsistance. <br /> <br />This task would include the following items: <br /> o Assistance in obtaining bids. <br /> o Answering guestions froxn contractors during the bidding period. <br /> o ASsistance in evaluation of the bids and contract award. <br /> Task VII. ASsistance During Construction. <br /> <br />During the construction phase we would provide the following services: <br /> o Attend pre-construction conference. <br /> o Review and approval of shop drawings and contractor su]mnittals. <br /> o Consultation as necessary to clarify plans and specifications. <br /> o Review of proposed change orders. <br /> o Final inspection. <br /> o Preparation of Record Drawings. <br /> <br />If requested, we would also be available to provide construction staking, <br />field inspection, or any other necessary services. <br /> <br />ESTIMATED FEE <br /> <br />We propose to contract for this work on a time and materials basis and <br />anticipate that it would handled as an addendure to our current contract. <br />Based on pre-ordering the pumps and the scope of work as outlined above, our <br />estimated mandays and resulting fee for each of the tasks is as follows: <br /> <br />WDP. 8.27 <br /> <br /> <br />