prepared new text sections, researched property ownership, <br />conducted a site inspection, and toured the county-owned <br />buildings to assess the potential hazardous waste problems <br />associated with their removal. <br /> <br />Task 3--Cultural Resources Supplemental Investigation <br /> <br />A reinspection of the Hacienda Drive/I-580 interchange was <br />required due to revisions in the Area of Potential Environ- <br />mental Impact IAPEI), resulting from the realignment of the <br />Frontage Road to accommodate the FHWA conditions of approval <br />of the Project Study Report (PSR). Also, during the course <br />of the review, it was discovered that the Historic Property <br />Survey Report (HPSR) prepared and submitted to Caltrans in <br />January 1986 had not been forwarded to FHWA and the State <br />Historic Preservation Officer (SHPO) by Caltrans. This over- <br />sight required that an updated, revised HPSR be prepared and <br />submitted to Caltrans for their delivery. <br /> <br />CH2M HILL hired a cultural resources subconsultant to inves- <br />tigate the new APEI, coordinated and incorporated the sub- <br />consultant report into the document text, prepared text for <br />the new, updated HPSR, and delivered the HPSR to Caltrans <br />Headquarters for processing. <br /> <br />Task 4--Complete Right-of-Way Data Sheet <br /> <br />Although it was stated at our September 30, 1986 meeting <br />with Ray Cook of the Caltrans Right-of-Way Branch that the <br />right-of-way data sheet was not required for this project, <br />Caltrans later requested on September 4, 1987 that CH2M HILL <br />complete the data sheet. Therefore, the Right-of-Way Data <br />Sheet was researched, prepared, and incorporated into the <br />Project Report (PR). <br /> <br />Task 5--Incorporate Caltrans Project Study Report Text into <br />Environmental Document <br /> <br />Caltrans requested that CH2M HILL incorporate and match the <br />text from their PSR "word for word" in the ED. After this <br />task was completed, Caltrans decided that the information in <br />the PSR could not be released to the public and required <br />that the PSR wording be removed from the ED. <br /> <br />Task 6--TJKM Supplemental Traffic Analysis <br /> <br />Caltrans requested the preparation of a supplemental analy- <br />sis to describe the impacts of a revised 1-580/I-680 inter- <br />change plan. CH2M HILL's subconsultant, TJKM, re-analyzed <br />the traffic data developed for the project and prepared a <br />new Traffic Report and Technical Appendix, dated December <br />1987. <br /> <br /> <br />