Exhibit 4-A <br /> AMENDMENT NO. 4 <br /> NPID FREEWAY IMPROVEMENTS PROJECT <br /> SCOPE OF SERVICES FOR ADDITIONAL WORK <br /> <br /> BACKGROUND <br /> <br />During the course of the project, CH2M HILL has provided the <br />services as outlined in Task 2.2, Project Completion Work, <br />of Amendment No. 2 to the Contract for Consulting Services <br />dated July 2, 1985. These services have been necessary to <br />continue the preparation and processing of the project en- <br />vironmental document, and have been performed at the direc- <br />tion of CITY staff. <br /> <br />The purpose of this AMENDMENT is to recognize and accept the <br />additional work performed by the CONSULTANT within the proj- <br />ect scope and to authorize the CONSULTANT to proceed with <br />additional work to obtain Caltrans' approval of the proposed <br />projects. It is assumed that: !) Caltrans will proceed <br />with review and approval of project documents in a timely <br />and consistent manner, and 2) that a Finding of No Signifi- <br />cant Impact (FONSI) will be issued for the Environmental <br />Document. <br /> <br /> SCOPE OF SERVICES <br /> <br />The CONSULTANT's work authorized by this AMENDMENT is divided <br />into two categories: 1) additional work beyond the project <br />scope authorized by Amendment No. 2, and 2) additional work <br />required to complete the project. <br /> <br />The following tasks summarize the work that was required to <br />continue the preparation and processing of the project en- <br />vironmental document. <br /> <br />ACTIVITIES NECESSARY TO REVISE THE OCTOBER 1986 NPID ENVIRON- <br />MENTAL ASSESSMENT AND INITIAL STUDY <br /> <br />Task 1--Noise Section Revision <br /> <br />CH2M HILL provided new noise measurements and text revisions <br />as required by Caltrans, since the project was delayed from <br />1985 to 1987. These delays were beyond the control of CH2M <br />HILL and the CITY. The results of the new analysis were <br />incorporated into the Environmental Document (ED). <br /> <br />Task 2--Hazardous Waste <br /> <br />Caltrans requested that a hazardous waste component be added <br />to Sections 3 and 5 of the ED. CH2M HILL researched and <br /> <br /> <br />