My WebLink
|
Help
|
About
|
Sign Out
08 ATTACHMENT 5
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
091807
>
08 ATTACHMENT 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2007 12:18:29 PM
Creation date
9/14/2007 12:18:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/18/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
08 ATTACHMENT 5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ranch Project includes an auto mall site encompassing 37 acres, a 45~ acre <br />senior continuing care community for up to 800 units plus supporting skilled <br />nursing facilities comprising approximately 1,400,000 square feet, a 17~ acre <br />community park, which may include lighted sports fields and afour-rink ice- <br />skating facility, and future commercial uses on the remaining 16 acres. The <br />AUTHORITY and PLEASANTON have entered into a Memorandum of <br />Understanding dated April 18, 2006, ("Staples Ranch MOU"), regarding the <br />processing of applications and consideration of entitlements required for the <br />Staples Ranch Project, and it is anticipated that PLEASANTON will consider <br />certifying an EIR for the Staples Ranch Project in 2008. Nothing in this <br />Agreement is intended to limit PLEASANTON's discretionary authority to <br />approve, conditionally approve, or deny the Staples Ranch Project as that <br />Project is described in the Staples Ranch MOU or as that Project may be <br />modified by the AUTHORITY or by PLEASANTON. <br />F. Both the El Charro Specific Plan and the Staples Ranch Project require <br />improvements to El Charro Road prior to occupancy of new developments, <br />and AUTHORITY and LIVERMORE, together with the County of Alameda <br />("the County"), PLEASANTON and Vulcan Materials, have negotiated and <br />are executing the Pre-Development Cooperation Agreement that specifies the <br />level and timing of construction of the El Charro Road Improvements. <br />G. The LIVERMORE EIR indicates that a portion of the El Charro Specific Plan <br />is currently within the 100-year flood zone, and that a portion of the Staples <br />Ranch Property is also within the 100-year flood zone. As described in the <br />Livermore EIR, flood water passes through the El Charro Specific Plan and <br />then crosses El Charro Road just south of Interstate 580. The LIVERMORE <br />EIR also indicates that LIVERMORE has proposed flood protection <br />improvements within the El Charro Specific Plan, including a North Overbank <br />and a South Detention Conveyance Facility ("Livermore Flood Protection <br />Improvements"), which would remove a portion of the El Charro Specific <br />Plan from the 100-year flood zone, without impacting downstream <br />development. The Livermore Flood Protection Improvements remove a <br />portion of the developable area of the El Charro Specific Plan from the 100- <br />year flood zone and will also remove all portions of the Staples Ranch <br />Property from the 100-year flood zone. <br />H. LIVERMORE is currently negotiating with the Alameda County Flood <br />Control and Water Conservation District, Zone 7 ("Zone 7") for <br />reimbursement from Zone 7 for all or part of the proposed Livermore Flood <br />Protection Improvements. Both LIVERMORE and AUTHORITY wish to <br />cooperate to fairly share the costs of both El Charro Road and the Livermore <br />Flood Protection Improvements, which costs include the cost of design, <br />construction, mitigation and any lease of land. <br />2 <br />Cost Sharing Agreement <br />Surplus Property Authority, Livermore and Pleasanton <br />
The URL can be used to link to this page
Your browser does not support the video tag.