My WebLink
|
Help
|
About
|
Sign Out
PC-2007-29, PTR-7890, HATSUSHI
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2007
>
PC-2007-29, PTR-7890, HATSUSHI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:37:44 AM
Creation date
8/30/2007 1:17:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/13/2007
DESTRUCT DATE
15 Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b. The project developer shall revise the typical section on Road B to have a <br />straight cross slope to the north. Road B shall be designed to drain <br />stormwater to the bioswale in Parcel C. This detail shall be designed to the <br />satisfaction of the City Engineer, shall be shown on the grading/drainage <br />plan submitted with the tentative subdivision map application, and shall be <br />subject to Planning Commission review and approval. <br /> <br />c. The EVA road connecting the Road A cul-de-sac to Montevino Road shall <br />intersect the public streets with a standard driveway. This detail shall be <br />designed to the satisfaction of the City Engineer, shown on the tentative <br />subdivision map application, and shall be subject to Planning Commission <br />review and approval. <br /> <br />d. The project developer shall install a concrete lined ditch along the common <br />property line between Parcel A and Lots 7, 8, and 9. This detail shall be <br />designed to the satisfaction of the City Engineer, shall be shown on the <br />grading/drainage plan submitted with the tentative subdivision map <br />application, and shall be subject to Planning Commission review and <br />approval. <br /> <br />f. The project developer shall revise the grade of Lot 2 to allow the driveway to <br />intersect the street at the bulb. This detail shall be designed to the <br />satisfaction of the City Engineer, shown on the tentative subdivision map <br />application, and shall be subject to Planning Commission review and <br />approval. <br /> <br />16. Phase One and Two Improvements <br /> <br />a. The project developer shall revise the grades on Street A such that the <br />maximum grades at the street intersections are seven percent or less. This <br />detail shall be designed to the satisfaction of the City Engineer, shown on <br />the tentative subdivision map application, and shall be subject to Planning <br />Commission review and approval. <br /> <br />c. The project developer’s engineer shall verify the capacity of the existing <br />downstream storm drain system at the tentative subdivision map stage to <br />the satisfaction of the City Engineer. The project developer shall be <br />responsible for installing any upgrades to the down stream drainage system <br />as required by the City Engineer. <br /> <br />24. With the tentative subdivision map, the project developer shall set forth the <br />common open space/maintenance areas of the proposed development and <br />maintenance responsibilities. The project developer shall record CC&R's at the <br />time of recordation of the final subdivision map, which shall create a property <br />owners association for the development. The CC&R's shall be subject to the <br />review and approval of the City Attorney prior to recordation of the final map. <br /> <br />3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.