Laserfiche WebLink
BACKGROUND <br />Beginning in 1990, the City established a series of replacement/renovation funds where <br />reserves are accumulated to fund future replacement costs, in accordance with the <br />City's financial policies. In December 1998, staff began to identify all City assets, <br />including condition, age, and expected replacement/renovation cycles and costs. From <br />this information, a 30-year "Replacement Plan" was developed and integrated into the <br />biennial Maintenance and Operations Budget. Annual revenue requirements were <br />determined for each fund, sufficient enough (with interest income) to fund the projected <br />annual replacement schedules. The replacement accruals minimize Operating Budget <br />fluctuations by amortizing capital costs over multiple fiscal years. It also ensures that <br />the replacement of large dollar items will not compete for budget funding with City <br />services or other capital improvements when the time comes for them to be replaced. <br />As part of the City's Replacement Plan, the Park Renovation Fund provides for major <br />renovations to City parks, facilities and street medians. Typical repairs include irrigation <br />systems, pathways, turf, trees, play areas, signs, and park furniture (barbecues, <br />benches, tables, drinking fountains, etc.). For the past several years, Parks and <br />Community Services Department staff have made project recommendations to the <br />Parks and Recreation Commission based on the funding available. <br />Staff completed a major update of the Replacement Plan as part of the Operating <br />Budget preparation process in spring 2001, 2003, and again in 2006. As a result, the <br />Park Renovation Fund now also provides for the long-term replacement/renovation of <br />Callippe Preserve Golf Course and the Pleasanton Pioneer Cemetery. Due to the <br />amount of work that will be required over the projected 30-year Replacement Plan, <br />variances will occur in the fund balance depending on the number of actual <br />improvements and scheduling. <br />The replacement schedule in "Financing Our Future" was intended to be a "fluid" <br />document that would be modified as park needs warranted. For FY 2007/08, staff has <br />again reassessed all City parks, trail facilities, and median areas. The attached list of <br />recommendations is based strictly on maintenance issues and current funding levels, <br />with the final decision based on public and Commission input, and approval by the <br />Council. <br />For FY 2007/08, $607,462 is available for renovation projects. The attached list <br />indicates the proposed projects by location and estimated cost. The improved condition <br />of the parks as a result of previously completed work has decreased the need for major <br />improvements, allowing the opportunity to focus the majority of funding on <br />improvements to the street median areas. <br />A significant portion of this year's funding ($490,000) is recommended for the <br />replacement of landscaping in street medians. Funds would be divided into two (2) <br />accounts, $90,000 for the replacement of declining plant material along Stanley Blvd, <br />First Street, and Bernal Avenue; and $400,000 as a set aside to begin large scale <br />renovation of entire median areas. Work began last year on design for the renovation of <br />20 center medians located on West Las Positas Avenue, from Santa Rita Road east to <br />Page 2 of 3 <br />