Laserfiche WebLink
Ruth and Going, Inc. R'JF'G <br /> <br />Fee Proposal 17091-109 <br /> <br /> b. All drawings shall be on 24" x 36" vellum or mylar sheets and <br /> specifications shall be Construction Specification Institute format <br /> on 8 1/2 x 11 paper, copier ready. Some specification data will <br /> appear as notes on the drawings. <br /> <br /> c. Statements of probable construction cost will be provided at the <br /> end of the Design Development phase and at the 85% Construction <br /> Document phase. Format will be CSI with quantities and unit prices. <br /> <br /> d. Preparation of a set of reproducible (Xerox velum) record drawings <br /> showing significant changes in work made during construction by <br /> the Contractor. The record drawings shall be developed from <br /> on-site construction documents maintained and updated by the <br /> General Contractor. <br /> <br /> e. Structural services are based on pre-engineered type buildings <br /> except for the firing range. For the buildings this includes <br /> foundation design based on the building manufacturer's imposed <br /> design loads and review of the building manufacturers design <br /> calculations. For the firing range structural services will include <br /> complete structural design of the building structural systems. <br /> Other miscellaneous services are as noted. <br /> <br /> f. Services will include coordination with gas, water, electric and <br /> telephone utilities. Services will also include providing demand <br /> loads and preparation of applications. <br /> <br /> g. Site design with regard to rough grading, surface drainage and <br /> capped utility laterals only for future development of the <br /> Southwest and Southeast corners of the site for School District and <br /> Animal Shelter facilities, respectively. <br /> <br /> 9. Design Services not included in Scope of Services: <br /> <br /> a. School District site and building facilities. (For site and building <br /> aesthetics, coordination and economy of construction costs, we <br /> recommend that School District facilities be included in the above <br /> Scope of Services prior to opening of construction bids.) <br /> <br /> b. Animal Shelter site and building facilities (see recommendation for <br /> School District facilities). <br /> <br /> Page 5. <br /> <br /> <br />