Laserfiche WebLink
BISSELL & KARN. INC. <br /> <br /> Job #8804048.00 <br /> November 4, 1988 <br /> <br /> sewer work and maintenance road for conceptual review and <br /> approval by the City, and Zone 7. Drainage, grading or any other <br /> problems, If any, will be identified and resolved at this stage. <br /> <br /> 5.2 Prepare a preliminary cost estimate based on the preliminary and <br /> conceptual plans. <br /> <br /> 5.3 Submit two blueline sets each to Caltrans and Zone 7 for <br /> conceptual review and approval. Submit two blueline sets to the <br /> City for Informational purposes. <br /> <br /> 5.4 Prepare graphics showing the typical appearance and location of <br /> the proposed soundwall for presentation to adjacent residents. <br /> <br /> 5.5 Prepare and mall notification of project and announcement of <br /> informational meeting to adjacent residents, City, Caltrans and <br /> Zone 7. Prepare and place announcement of meeting in local <br /> newspaper. City to pay advertisement fee. Arrange for meeting <br /> place. <br /> <br /> 5.6 Present the proposed soundwall project to the adjacent residents <br /> at a neighborhood meeting. Collect comments and concerns. <br /> <br /> 5.7 Meet with City, Caltrans and Zone 7 after neighborhood meeting, <br /> if necessary, to discuss the review comments from City, Caltrans <br /> and Zone 7 and local residents' concerns. <br /> <br />B. DESIGN ENGINEERING <br /> <br />6.0 Develop Plans, Specifications, and Estimate <br /> <br /> 6.1 Design: <br /> <br /> Detailed design will proceed when site Information, surveys and <br /> base mapping have been obtained; and when comments on preliminary <br /> plans have been reviewed and any necessary modifications to the <br /> preliminary plans have been approved by the agency who requested <br /> the modification. <br /> <br /> · Design will be based on Caltrans standard design for <br /> soundwalls with site specific modifications as necessary. <br /> During design the preliminary horizontal and vertical <br /> alignment for the proposed wall will be finalized. <br /> <br /> · Sanitary sewer design will be in accordance with City of <br /> Pleasanton standards. <br /> <br />I>TP.32.3.6 3 <br /> <br /> <br />