My WebLink
|
Help
|
About
|
Sign Out
RES 88534
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88534
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2012 2:39:01 PM
Creation date
11/30/1999 11:16:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/15/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BISSELL & KARN. INC. <br /> <br /> Job #8804048.00 <br /> November 4, 1988 <br /> <br /> 2.3 Review acoustical Investigations by Caltrans to determine height <br /> of soundwall to mitigate noise to FHWA standard. Review wall <br /> type alternatives. <br /> <br /> 2.4 Review Negative Declaration and Finding Of No Significant Impacts <br /> (FONSI) prepared by Caltrans for any pertinent information, <br /> <br /> 2.5 Contract with title company to prepare Title Report for Zone 7 <br /> property. <br /> <br />3.0 Surveys and Base Mapping <br /> <br /> 3.1 Prepare base mapping at 50-scale showing topographic features <br /> within the construction area; Including the existing right-of- <br /> way and property lines as obtained from record data and recent <br /> Caltrans survey. It Is anticipaled that existing aerial <br /> topographic mapping could be used for this task. <br /> <br /> 3.2 Perform topographic surveys to provide existing ground profile <br /> along preferred soundwall alignment. Locate existing fences and <br /> property corners. Also locate any potential obstructions. <br /> <br />4.0 Develop Sewer Alignment Alternatives <br /> <br /> 4.1 Develop and evaluate sewer alignment and channel configuration <br /> options regarding the relationship of the existing sanitary <br /> sewer, the proposed Crosstown Interceptor Sewer and the proposed <br /> soundwall, Determine sizes of sewer pipe needed for each <br /> alternative. Review potential types and locations for soundwall <br /> footings. Investigate potential maintenance road locations and <br /> channel side slopes. Coordinate with Brown & Caldwell. Berlogar <br /> to study canal bank stability, trench shoring and other related <br /> Issues. Investigate feasibility of constructing sanitary sewer <br /> relocatlons as separate project subsequent to soundwall <br /> construction. <br /> <br /> 4.2 Prepare letter-report discussing the alternatives. Recommend one <br /> alternative. Submit 2 copies of letter-report each to City of <br /> Pleasanton, Caltrans and Zone 7. <br /> <br /> 4.3 Obtain conceptual approval of soundwall, sanitary sewer and <br /> maintenance road configuration along flood control channels from <br /> Zone 7, City and Caltrans. <br /> <br />5.0 Preliminary Design <br /> <br /> 5.1 Prepare preliminary plans showing proposed alignment, profile, <br /> and aesthetic treatment of the soundwall, for review and approval <br /> by City and Zone 7. Prepare conceptual plans for the sanitary <br /> <br /> PTP.32.16 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.