Laserfiche WebLink
EXHiBiT "A" BISSELL & KARN. INC. <br /> <br /> Job #8804048.00 <br /> November 4, 1988 <br /> <br /> 1-680 SOUNDWALLS <br /> CITY OF PLEASANTON <br /> <br /> SCOPE OF WORK <br />1.0 Project Management <br /> <br /> 1.1 Prepare and maintain detailed project schedule for use in <br /> tracking progress of work. <br /> <br /> 1.2 Coordination: <br /> <br /> Meet with City, Caltrans and Zone 7 during preparation of the <br /> preliminary and conceptual plans to discuss design and <br /> aesthetic concepts and parameters. <br /> <br /> · Schedule two coordination meetings with the City, C81trans and <br /> Zone 7 during Task 6.0 Develop Plans, Specifications, and <br /> Estimate, to identify and resolve design problems: <br /> <br /> one meeting at approximately the 50% level of plan <br /> preparation. <br /> <br /> the second meeting at approximately the 80% level of plan <br /> preparation. <br /> <br /> Prepare and mail the minutes of each meeting to the City, <br /> Caltrans and Zone 7. <br /> <br /> · Prepare and deliver to the City monthly project status reports <br /> (hi-weekly at critical times). Status reports to cover: <br /> progress of project, compliance with schedule, compliance with <br /> budget. <br /> <br />A. PRELIMINARY ENGINEERING <br /> <br />2.0 Data end Information Collection/Review <br /> <br /> 2.1 Obtain existing data and Information including "as-built" plans, <br /> utility locations, assessor's maps, current Assessors Owner Roll <br /> from the City, Alameda County Flood Control & Water Conservation <br /> DIstrict-Zone 7, Caltrans, utility companies, title company and <br /> other agencies as necessary. <br /> <br /> 2.2 Review geotechnical investigations prepared by Caltrans, Berlogar <br /> and other sources as available to determine soil characteristics, <br /> and appropriate foundation requirements. Berlogar shall perform <br /> this review and make recommendations as appropriate. <br /> <br />PTP.32.Z6 3, <br /> <br /> <br />