Job No. 16158-0 <br /> <br /> EXHIBIT A <br /> Page 2 of 4 <br /> <br /> 3. Prepare Conceptual Design Report draft for City staff review including cost vs. <br /> benefit matrix. <br /> 4. Prepare Conceptual Design Report and present to City staff, Downtown Merchants <br /> Association, Downtown Community Development Agency, and the Pleasanton <br /> City Council. <br /> 5. Summarize expressed concerns and/or questions and prepare written response. <br /> <br />Phase four: Preparation of Preliminary Design Report for the preferred alternative and <br /> including the following: <br /> <br /> 1. Precise alignment plan (may require a Plan Line map for Council action). <br /> 2. Delineate road geometrics, typical section and profiles, if appropriate. <br /> 3. Delineate existing and proposed right of way and easements. <br /> 4. Recommend construction phasing to minimize and control construction phasing <br /> to minimize and control construction/traffic conflicts. <br /> 5. Prepare construction cost estimate. <br /> <br />PART II - DESIGN <br /> <br />This agreement provides for final design plans, special provisions, bid documents <br />detailed construction cost estimate, and Right of Way engineering services. A detailed <br />scope of work will be added as an amendement to this agreement after the completion of <br />Part I, Preliminary Engineering and Planning, of this agreement. <br /> <br />PART III - CONSTRUCTION STAKING <br /> <br />This agreement provides for construction staking. A detailed scope of work will be added <br />as an amendment to this agreement after the completion of Part I, Preliminary <br />Engineering and Planning, of this agreement. <br /> <br />PART IV - CONSTRUCTION CONSULTATION <br /> <br />This agreement provides for construction consultation. A detailed scope of work will be <br />added as an amendement to this agreement after the completion of Part I, Preliminary <br />Engineering and Planning, of this agreement. <br /> <br /> <br />