My WebLink
|
Help
|
About
|
Sign Out
2382
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1983
>
2382
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 12:38:23 PM
Creation date
7/31/2007 11:43:52 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/9/1983
DOCUMENT NO
2382
DOCUMENT NAME
GP-81-30
NOTES
PRUDENTIAL INSURANCE COMPANY OF AMERICA AND CALLAHAN-PENTZ
NOTES 2
DEVELOPMENT PLAN APPROVAL OF A 573 ACRE PORJECT HACIENDA BUSINESS PARK
NOTES 3
PLEASANTON
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- 3. Constructed soundwalls along the required <br />portions of Santa Rita Road, West Las <br />Positas Boulevard east of the site; and <br />Hopyard Road. <br />C. Condition 20 - Dedicated in-tract streets to City. <br />D. Condition 25 - Submitted CC&R's for City approval. <br />E. Condition 42 - Entered landscape agreement. <br />F. Condition 49 - Obtained encroachment permit prior <br /> to construction.. <br />G. Condition 51 - Final design of streets have been <br /> approved. <br />H. Condition 52 - Design criteria for utilities <br /> submitted and approved. <br />I. Condition 57 - CC&R's require Transportation Systems <br /> Management Program by companies with <br /> 100 or more employees. <br />J. Condition 58 - Bus stops and shelters have been <br /> approved and installed. <br />K. Condition 62 - Any prior assessment districts were <br /> cleared prior to filing parcel map. <br />L. Condition 65 - Erosion and sediment control plans <br /> have been approved and constructed. <br />M. Condition 83 - CC~R's provide for maintenance of <br />N. Condition 85 <br />0. Condition 87 <br />P. Condition 89 <br />Q. Condition 93 <br />R. Condition 95 <br />Condition 98 <br />T. Condition 99 <br />in-tract streets for 10 years. <br />- All wells,. septic tanks and other tanks, <br />were properly sealed prior to grading. <br />- A dust control plan has been approved. <br />- Water system has been approved, meeting <br />immediate and long-range requirements. <br />Sewer system has been approved, meeting <br />immediate and long-range requirements. <br />Storm drainage system has been approved, <br />meeting flood control and flood hazard <br />program requirements and meeting long- <br />range requirements. <br />Hazard control bond was submitted prior <br />to construction. <br />Landscape and irri¢ation plans have been <br />approved and installed. <br />No occupancy was allowed until the local <br />traffic assessment district was <br />formed and the developer was legally <br />committed to the Tlorth Pleasanton Traffic <br />Assessment District. <br />U. Condition 106- <br />WHERES, in conjunction with a proposed amendment to the Growth <br />Management Element of the General Plan, the Developer <br />has proposed that the City rea_nprove PUD-81-30, inco- <br />porating the 109 conditions of approval of Ordinance <br />1040 in its project description, and the City has <br />prepared, pursuant to CF:O_A, a supplement to the EIR <br />for PUD-81-30; and <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.