My WebLink
|
Help
|
About
|
Sign Out
2382
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1983
>
2382
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 12:38:23 PM
Creation date
7/31/2007 11:43:52 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/9/1983
DOCUMENT NO
2382
DOCUMENT NAME
GP-81-30
NOTES
PRUDENTIAL INSURANCE COMPANY OF AMERICA AND CALLAHAN-PENTZ
NOTES 2
DEVELOPMENT PLAN APPROVAL OF A 573 ACRE PORJECT HACIENDA BUSINESS PARK
NOTES 3
PLEASANTON
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
incorporated into the Project will substantially <br />lessen the significant effect. <br />B. <br />C. <br />a.6 Fact. See Section Xii (for infeasibility of <br />Alternatives). <br />a.7 Fact. See Sections IV.a.4, IV.a.2 (Water demand <br />mitigations). <br />Significant Effect. Large increase in water use on <br />site. <br />b.l Finding. The mitigation measure incorporated <br />into the Project to control water use will <br />substantially lessen the effect. <br />b.7 Fact. Condition No. 48 requires installation of <br />water conserving plumbing fixtures. <br />b.3 Finding. The Reduced Intensity of Development <br />Alternative, No Project Alternative, Partial <br />Approval Alternative or Mixed Use Alternative <br />could partially mitigate the effect. However, <br />each of these Alternatives is infeasible and <br />unnecessary as the mitigation measures incor- <br />porated into the Project will substantially <br />lessen the significant effect. <br />b.4 Fact. See Section XII (for infeasibility of <br />Alternatives), <br />b.5 Fact. See Section IV.b.2 (Water conservation <br />mitigations). <br />b.6 Findin The recommended mitigation measures, <br />of minimizing landscaping water use and indus- <br />trial water use, are unnecessary. <br />b.7 Fact. Economic impact of wastewater connection <br />and use fees will encourage minimization of <br />industrial water use. There is sufficient water <br />supply to meet the projected demand. <br />Significant Effect. Generation of sewage effluent <br />beyond capacity available to the site. <br />c.l Finding. The mitigation measure incorporated <br />into the Project to control generation of sewage <br />effluent will substantially lessen the effect. <br />9. <br />
The URL can be used to link to this page
Your browser does not support the video tag.