My WebLink
|
Help
|
About
|
Sign Out
2261
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1983
>
2261
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2010 2:02:15 PM
Creation date
7/30/2007 11:14:39 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/12/1983
DOCUMENT NO
2261
DOCUMENT NAME
TRACT 5115
NOTES
CHANG SU-O LIN
NOTES 2
71 UNIT TOWNHOUSE RESIDENTIAL SUBDIVISION OF APPR. 6.5 ACRES OF LAND
NOTES 3
E. OF MURIWOOD DR. BET. W. LAS POSITAS BLVD AND PECAN CT.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1/12/83 <br />Tract 5115 <br />Page 2 <br />7. That all existing wells, septic tanks or holding <br />tanks on the site be properly sealed, filled ar~d <br />abandoned prior to the start of grading operations <br />unless Zone 7 retains specific wells for observation <br />wells, or special approval is obtained from the City <br />Engineer for temporary use of an existing well for <br />construction water. <br />8. That the haul route for all materials to and from <br />this development be approved by the City Engineer <br />prior to approval of the final map or the start of <br />any construction. <br />9. That the developer submit an erosion and sedimenta- <br />tion control plan or procedure as part of the <br />improvement plans prior to the approval of the final <br />map. <br />10. That the developer submit a dust control plan or <br />procedure as part of the improvement plans prior to <br />approval of the final map. <br />_ 11. That storm drainage swales, gutters, inlets, outfalls <br />and channels not within the area of a dedicated public <br />street or an approved public service easement be <br />privately maintained by the property owners or through <br />an association approved by the City. <br />12. That approval of the water supply and distri- <br />bution system be withheld pending final design <br />and until the developer has demonstrated to the <br />satisfaction of the City Engineer that the proposed <br />system meets both the immediate and long range <br />requirements for supplying water in this area. <br />13. That the developer comply with any and all appli- <br />cable requirements of the cross-connections control <br />and backflow prevention device programs required by <br />the California Administrative Code, Title 17. <br />14. That the developer pay the applicable Zone 7 and <br />City connection fees and the meter cost prior to <br />Council approval of the development for any water <br />meters (irrigation meters) not directly related <br />to a building permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.