My WebLink
|
Help
|
About
|
Sign Out
2261
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1983
>
2261
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2010 2:02:15 PM
Creation date
7/30/2007 11:14:39 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/12/1983
DOCUMENT NO
2261
DOCUMENT NAME
TRACT 5115
NOTES
CHANG SU-O LIN
NOTES 2
71 UNIT TOWNHOUSE RESIDENTIAL SUBDIVISION OF APPR. 6.5 ACRES OF LAND
NOTES 3
E. OF MURIWOOD DR. BET. W. LAS POSITAS BLVD AND PECAN CT.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1/12/83 <br />Tract 5115 <br />Page 3 <br />15. That a separate water meter be provided to each <br />lot of record within the development unless <br />otherwise approved by the City Engineer. <br />16, That approval for the number, type and location <br />of fire hydrants be withheld pending final design, <br />review by the Fire Marshal, and final review by <br />the City Engineer. <br />17. That approval of the sanitary sewer system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisfaction of the City <br />Engineer that the proposed system is adequate, <br />connects to an approved point of discharge, and <br />meets both the immediate and long-range require- <br />ments of the sanitary sewer system in this and all <br />tributary areas. <br />18. That a separate sanitary sewer lateral be provided <br />to each lot of record within the development unless <br />otherwise approved by the City Engineer. <br />19, That approval of the storm drainage system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisfaction of the City <br />Engineer that the system is adequate, connects to an <br />approved point of discharge, meets any and all appli- <br />cable requirements of the Alameda County Flood Control <br />District.- Zone 7, meets any and all applicable <br />requirements of the Federal Emergency Management <br />Flood Hazard Program, and meets any and all require- <br />ments of Cal Trans, and meets the immediate and <br />long-range requirements of this development and all <br />upstream areas intended to be drained through this <br />tract. <br />2C. That electric power distribution, gas distribution, <br />communication service, and any required alarm systems <br />be installed underground in a joint utility trench <br />unless otherwise specifically approved by the City <br />Engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.