My WebLink
|
Help
|
About
|
Sign Out
2272
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1983
>
2272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2010 2:02:27 PM
Creation date
7/30/2007 10:53:25 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/9/1983
DOCUMENT NO
2272
DOCUMENT NAME
PUD-83-1
NOTES
DUNCAN MATTESON AND JOHN FERRERI
NOTES 2
PUD-HDR ZONING AND DEVELOPMENT APPROVAL FOR 154 UNIT MULTI-FAMILY RESIDENTIAL PROJECT
NOTES 3
4323 AND 4365 VALLEY AVE.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
47, That separate water meters be provided to eac <br />of record within the development unless other <br />approved by the City Engineer. <br />48. That approval for the number, type and locati <br />hydrants be withheld pending final design rev <br />Fire Marshal, and final review by the City En <br />lot <br />se <br />of fire <br />b'y the <br />49. That approval of the sanitary sewer system be with- <br />held pending final design and until the devel per has <br />demonstrated to the satisfaction of the City ngineer <br />that the proposed system is adequate connects to an <br />approved point of discharge, and meets both t e immediate <br />and long-range requirements of the sanitary s wer system <br />in this and all tributary areas. <br />50. That a separate sanitary sewer lateral be pro <br />to each lot of record within the development <br />otherwise approved by the City Engineer. <br />51. That approval of the storm drainage system be <br />pending final design and until the developer <br />to the satisfaction of the City Engineer that <br />adequate, connects to an approved point of di <br />any and all applicable requirements of the Al <br />Flood Control District - Zone 7, meets any an <br />requirements of the Federal Emergency Managem <br />Program, and meets the immediate and long-ran <br />of this development and all upstream areas in <br />drained through this tract. <br />52. That electric power distribution, gas distrib <br />communication service, and any required alarm <br />be installed underground in a joint utility t. <br />unless otherwise specifically approved by the <br />Engineer. <br />53 .. That the developer be responsible for the ins' <br />the street lighting system within the develop <br />street lights shall be 70 watt, high pressure <br />vapor units mounted on galvanized steel poles <br />in place bases, on the LS-1C schedule per City <br />and P,G,andE, standard details unless otherwi; <br />approved, Approval for the number, location, <br />electroliers shall be withheld pending final ~ <br />review by the City Engineer. <br />less <br />withheld <br />as demonstrated <br />the system is <br />charge, meets <br />meda County <br />all applicable <br />nt Flood Hazard <br />requirements <br />ded to be <br />systems <br />ity <br />llation of <br />nt. The <br />odium <br />ith poured <br />requirements <br />specifically <br />nd type of <br />sign and <br />A-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.