My WebLink
|
Help
|
About
|
Sign Out
2128
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1982
>
2128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:34:27 AM
Creation date
7/26/2007 1:41:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/13/1982
DOCUMENT NO
2128
NOTES
CITY OF PLEASANTON
NOTES 2
ADOPTION OF STAFF REPORT REGARDING "LOWER INCOME HOUSING"
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,. <br />`- ~ C <br />shall be submitted to the Planning Commission and <br />( Council, who will jointly review the projects. i <br />This latter review shall be in accord with the. <br />requirements of California la~o relating to zoning <br />and general plans and the California Environmental <br />Quality Act. Regular notifications pursuant to <br />those laws will be given. The final selection of the <br />approved project(s) shall be at a public. hearing. <br />c. The City Council shall use the following criteria <br />in selecting the project(s): <br />(1) Location and the appropriateness of the <br />• particular project to the location. <br />(2) Affordability of for-sale units and whether <br />rental units are included. <br />(3) Design: attractiveness, site suitability <br />and efficiency of the use of the land. <br />(4) Probability of performance by the builder <br />and the likely timing involved. <br />(5) Degree to cohich the proposed project meets the <br />goals of the Housing Element of the General Plan. <br />( d. The chosen project(s) will be given priority process- ~ <br />' ing through city review processes ( fast tracking ). <br />Developer ~•~ill be given a definite date when building <br />permits will be issued in consideration for his <br />participation in this program. <br />e. Collection of najor-city development fees shall be <br />postponed where possible until certificates of <br />occupancy are issued to complete d*.aelling units. <br />City will work with other local fee collection <br />agencies to encourage postponement of collection <br />of their fees where possible. <br />f. Any outside plan checking or staff overtime costs <br />involved in "fast tracking" shall be absorbed by <br />the city. <br />g. Sewer capacity shall be guaranteed for a specified <br />period of time for the chosen project(s). <br />h. The developer(s) of project(s) selected by the city <br />shall negotiate an agreement guaranteeing affordability <br />of units to target groups, permit issuance date, <br />construction commencement target, estimated develop- <br />ment and sales schedule, and completion date with <br />l penalty schedule. \ <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.