My WebLink
|
Help
|
About
|
Sign Out
2189
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1982
>
2189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:34:29 AM
Creation date
7/26/2007 10:57:17 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/24/1982
DOCUMENT NO
2189
DOCUMENT NAME
TRACT 4936
NOTES
PLEASANTON DEVELOPER GROUP
NOTES 2
SUBDIVISION
NOTES 3
NW CORNER OF VALLEY AVE AND PASEO SANTA CRUZ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9• That all existing wells, septic tanY.s or holding <br />tanks on the site be properly sealed, filled and <br />abandoned prior to the start of grading operations <br />ixnless Zone 7 retains specific wells for observation <br />wells, or special approval is obtained from the City <br />Engineer for temporary use of an existing well for <br />construction water. <br />10. That the haul route for all materials to and from <br />this development be approved by the City Engineer <br />prior to approval of the final map or the start of <br />any construction. <br />11. That the developer include erosion and sedimentation <br />control provisions as part of the improvement plans <br />prior to approval of the final map. <br />12. That the developer include dust control provisions <br />as part of the improvement plans prior to approval <br />of the final map. <br />13. That approval of the water supply and distri- <br />bution system be withheld pending final design. <br />14. That the developer pay the applicable Zone 7 and <br />City connection fees and the meter cost prior to <br />Council approval of the development for any water <br />meters (irrigation meters) not directly related <br />to a building permit. <br />15. That a separate water meter be provided to eackr <br />lot of record within the developnent unless <br />otherwise approved by the City Engineer. <br />16. That approval for the number, type and location <br />of fire hydrants be withheld pending final design, <br />review by the Fire Marshal, and final review by <br />the City Engineer. <br />17. That approval of the sanitary secaer systeri be with- <br />held pending final design. <br />18. That a separate sanitary sewer lateral be provided <br />to each lot of record within the development unless <br />otherwise approved by the City Engineer. <br />19. That approval of the storm drainage system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisfaction of the City <br />Engineer that the system is adequate, connects to an <br />approved point of discharge, meets any and all <br />applicable requirements of the Alameda Flood Control <br />A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.