Laserfiche WebLink
( I <br />18. That the haul route for all materials to an~ from this <br />development be approved by the City Enginee prior to <br />the start of any construction. <br />19. That the developer submit an erosion and se imentation control <br />plan or procedure as part of the improvemen plans prior to <br />the final approval of the development. <br />20. That the developer submit a dust control pl <br />part of the improvement plans prior to the <br />the development. <br />21. That storm drainage swales, gutters, inlets <br />channels not within the area of a dedicated <br />or public service easement approved by the <br />privately maintained by the property owners <br />association approved by the City. <br />n or procedure as <br />final approval of <br />outfalls, and <br />public street <br />ity Engineer be <br />or through an <br />22. That approval of the water supply and distr'bution system be <br />withheld pending final design and until the developer has <br />demonstrated to the satisfaction of the Cit Engineer that <br />the proposed system meets both the immediat and long-range <br />requirements for supplying water in this ar a. <br />23. That the developer comply with any and all pplicable requirements <br />of the cross-connections control and backfl w prevention device <br />programs required by the California Adminis rative Code,• <br />Title 17. <br />24. That the developer pay the applicable Zone and City <br />connection fees and the meter cost prior to Council <br />approval of the development for any water m ters <br />(irrigation meters) not directly related to a building <br />permit. <br />25. That approval for the number, type and loca <br />hydrants be withheld pending final design, <br />Fire Marshal, and final review by the City <br />26. That approval of the sanitary sewer system <br />final design and until the developer has de <br />satisfaction of the City Engineer that the <br />adequate, connects to an approved point of <br />both the immediate and long-range requireme <br />system in this and all tributary areas. <br />ion of fire <br />eview by the <br />ngineer. <br />e withheld pending <br />onstrated to the <br />roposed system is <br />ischarge, and meets <br />is of the sanitary <br />27. That approval of the storm drainage system a withheld <br />pending final design and until the develope has demonstrated <br />to the satisfaction of the City Engineer th t the system is <br />adequate, connects to an approved point of ischarge, meets any <br />and all applicable requirements of the Alam da County Flood <br />Control District - Zone 7, meets any. and al applicable require- <br />ments of the Federal Emergency Management F ood Hazard Program, <br />and meets the immediate and long-range requ rements of this <br />development and all upstream areas intended to be drained through <br />this development. <br />