Laserfiche WebLink
14. The most northerly proposed driveway on Santa Rita Road <br />(adjacent to the Exxon station) shall be deleted due to <br />the potential conflicts with the existing Exxon driveway <br />and the bus turn-out. This driveway may be relocated <br />approximately 210 ft. to the south at a point which <br />will line up with the proposed driveway south <br />of the 24,000 sq. ft. phase 2 office building. This <br />driveway should be designed with a street type opening <br />with minimum 10 ft. radius curb returns. <br />15. The existing driveway on Santa Rita Road, opposite <br />Navajo Court, is aligned with the existing median break. <br />The proposed on-site drive shall be realigned to meet this <br />driveway. <br />16. The existing 40 ft. wide driveway on Santa Rita Road <br />(approximately 135 ft. south of the Navajo Court median <br />break shall be removed unless otherwise approved by the <br />City Engineer. <br />17. The existing driveway on Santa Rita Road just north of the <br />Arroyo Mocho bridge, which provides access to the north <br />bank of the Arroyo Mocho and which lies within an existing <br />Zone 7 easement, shall remain unless otherwise approved by <br />the City Engineer and Zone 7 and the proposed parking areas, <br />within the easement shall be deleted if required by Zone 7 <br />and the City Engineer. <br />18. The centerline of the proposed driveway on West Las <br />Positas Boulevard shall be aligned with the centerline <br />of Fairlands Drive. <br />19. The two parking stalls shown in the end of the parking <br />island south of the "Urgent Care" center shall be <br />deleted. <br />20. The masonry wall shown along the east property line, if <br />installed, shall be entirely on the east side of the <br />drainage easement to afford full access to the under- <br />ground public utilities for maintenance purposes. <br />