My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
061907
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2007 10:14:45 AM
Creation date
6/15/2007 9:44:10 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/19/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUD-93-02-09M <br />2001 Ruby Hill Boulevard <br />13. PUBLIC SERVICES <br />Environmental Setting <br />The City of Pleasanton has public services and infrastructure planned to meet the build out of the General <br />Plan, implemented by the Growth Management Plan. <br />Standards of Significance <br />For purposes of this environmental document, an impact is considered significant if the proposed project <br />would: <br />• Create an increase in demand for police protection services which could substantially interfere <br />with the ability of the Police Department to provide adequate response time to the project site; <br />• Create an increased demand for fire protection services that would substantially interfere with the <br />ability of the Fire Department to provide adequate response time to the project site; <br />• Crease an increased demand for schools that would exceed existing school capacity; or, <br />• Create an increased demand for parks and other public facilities that would exceed existing <br />capacity. <br /> <br /> <br /> <br /> <br />ssues <br /> <br />Potentially <br />Significant <br />Impact Less Than <br />Significant <br />With <br />Mitigation <br />Incorporated <br /> <br />Less Than <br />Significant <br />Impact <br /> <br /> <br />o <br />Impact <br />Public Services <br />Would the project: <br />a) Would the project result in substantial adverse <br />physical impacts associated with the provision of new <br />or physically altered governmental facilities, need for <br />new or physically altered governmental facilities, the <br />construction of which could cause significant <br />environmental impacts, in order to maintain <br />acceptable service ratios, response times or other <br />pertormance objectives for any of the public services: <br />Fire protection? <br />Police protection? <br />Schools? <br />Parks? <br />Other public facilities? <br />Discussion <br />a) Public services have been analyzed related to the subject site in that the City's Growth <br />Management Plan which evaluates the demand for services to ensure that developments can be <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.