Laserfiche WebLink
Bernal Avenue between Nevada Court and the entrance facing Utah <br />Street, subject to the review and approval of the Planning Director and the <br />City Engineer. Design modifications to the adjacent frontage of the <br />parking area may or may not be required at the discretion of the Planning <br />Director. <br />c. Install a modified bus turnout with a bus shelter pad on the east side <br />Bernal Avenue northerly of the development's entrance opposite Utah <br />Street. The project developer's engineer shall work with the City Engineer <br />to modify the length of the turnout to minimize the disturbance of the <br />existing utility boxes. The project developer shall purchase a shelter for <br />this location, and shall deliver it to the Livermore-Amador Valley Transit <br />Agency's (LAVTA) corporation yard. After LAVTA establishes a bus route <br />on Bernal Avenue, LAVTA shall be responsible for installing the shelter, <br />garbage container, etc. <br />d. Install an approximately 10-foot wide by 40-foot long concrete pad within <br />the roadway on Stanley Boulevard between the development's driveway <br />entrances, and provide a shelter and garbage container at this location for <br />the bus stop. <br />e. An encroachment permit shall be obtained prior to the above-stated <br />installations. Lighting shall be provided at these stops and shelters. The <br />bus shelter designs, including bench style and trash container shall be <br />submitted to the Planning Director for review and approval before <br />installation/purchase. The shelters shall be maintained by LAVTA and the <br />weekly trash pick up shall be administered by the property owner or by the <br />property owner's association if the project covered by this approval is <br />subdivided. <br />f. If the project is phased, with the first construction phase install a traffic <br />signal at the Utah Street/Bernal Avenue intersection, including the <br />installation of the traffic signal interconnect. The traffic signal interconnect <br />shall tie to the existing traffic signal controller on Stanley Boulevard and <br />run along the project Bernal Avenue frontage to Nevada Court. This <br />signal shall be operational before project occupancy. <br />g. The design of the left turn pocket on Stanley Boulevard to the easternmost <br />driveway entrance shall be submitted to the City Engineer for review and <br />approval. If necessary, the project developer shall apply for an <br />encroachment permit from Alameda County for any part of the <br />deceleration lane within the County jurisdiction. <br />h. Modify the median break on Stanley Boulevard opposite the easternmost <br />driveway entrance to prevent drivers exiting this driveway from turning left. <br />Page 2 of 21 <br />