Laserfiche WebLink
EXHIBIT B <br />CONDITIONS OF APPROVAL <br />PDR-529, Pleasanton Gateway/Home Depot <br />3450 Stanley Boulevard <br />May 15, 2007 <br />Project Specific Conditions: <br />1. The public improvements, landscaping, and buildings covered by this approval <br />shall be constructed/installed substantially as shown on the development plans, <br />Exhibit A, dated "Received December 5, 2006, 2006" on file with the Planning <br />Department, except as modified by the following conditions. The Planning <br />Director may allow minor changes to the plans, upon a determination that such <br />changes do not constitute a project under the California Environmental Quality <br />Act (CEQA). <br />2. Any proposed phasing on the remaining portions of this development, including <br />construction staging, shall be stated on the building permit plan set and shall <br />include a narrative explaining the proposed phasing. Unless the Planning <br />Director approves a phasing plan, the project developer shall complete all on-site <br />improvements at one time, including all improvements around future building <br />pads. All remaining pad areas shall be planted with turf material and shall be <br />watered and kept in a neat and weed-free manner at all times. <br />3. If a phasing plan is approved, the project developer shall construct the urban <br />stormwater runoff mitigation measures for the entire development with the first <br />construction phase. This includes the perimeter bio-swale areas, driveway <br />accesses, separated public sidewalks with street trees and irrigation, public <br />infrastructure including intersection improvements, etc. <br />4. The project developer shall be responsible for the following and shall make the <br />necessary changes to the plans covered by this approval: <br />a. Install aten-foot wide sidewalk/bike path along the Stanley Boulevard <br />project frontage and an eight-foot wide sidewalk/bike path along the <br />Bernal Avenue project frontage, with a five-foot wide planter strip <br />separating the sidewalk/bike path from the street. This planter shall be <br />landscaped and maintained by the property owner or by the property <br />owner's association if the project covered by this approval is subdivided. <br />The location and design shall be reviewed and approved by the Planning <br />Director prior to submittal for building permits. <br />b. Provide a separated sidewalk and an adequate landscape area fora bio- <br />swale between the sidewalk and the parking spaces facing the portion of <br />Page 1 of 21 <br />