My WebLink
|
Help
|
About
|
Sign Out
RES 07127
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2007
>
RES 07127
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2007 4:22:07 PM
Creation date
6/12/2007 4:21:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/15/2007
DOCUMENT NO
RES 07127
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Requirements: <br />57. All construction, including site improvements, building construction, and tenant <br />improvement construction shall be limited to the hours of 7:00 a.m. to 6:00 p.m., <br />Monday through Saturday. Signs stating construction hours shall be posted <br />throughout the construction site, in construction trailer(s), and on all floors of all <br />buildings during the duration of construction. The Planning Director may allow <br />earlier "start-times" for specific building construction activities, e.g., concrete- <br />foundation/floor-pouring, if it can be demonstrated to the satisfaction of the <br />Planning Director that the construction and construction traffic noise can be <br />mitigated. All construction equipment must meet Department of Motor Vehicles <br />(DMV) noise standards and shall be equipped with muffling devices. <br />58. At no time shall campers, trailers, motor homes, or any other vehicle be used as <br />living or sleeping quarters on the construction site. All such vehicles shall be <br />removed from the site at the end of each workday. A construction trailer shall be <br />allowed to be placed on the project site for daily administration/coordination <br />purposes during the construction period. <br />59. Final inspection by the Planning Department is required prior to occupancy. <br />60. If archeological materials are uncovered during grading, trenching, or other on- <br />site excavation, all work on site shall be stopped and the City immediately <br />notified. The county coroner and the Native American Heritage Commission <br />shall also be notified and procedures followed as required in Appendix K of the <br />California Environmental Quality Act (CEQA). A similar note shall appear on the <br />building permit plans and improvement plans. <br />61. Portable toilets used during construction shall be emptied on a regular basis as <br />necessary to prevent odor. <br />Fire Department Requirements: <br />62. The project developer shall meet all requirements of the Pleasanton Fire Code <br />(Pleasanton Municipal Code, Chapter 20.24). <br />63. The building(s) covered by this approval shall be equipped with an automatic fire <br />sprinkler system. Plans and specifications for the automatic fire sprinkler system <br />shall be submitted to the Pleasanton Building and Safety Division for review and <br />approval prior to installation. The fire alarm system, including waterflow and <br />valve tamper, shall have plans and specifications submitted to Fire Prevention for <br />review and approval prior to installation. All required inspections and witnessing <br />of tests shall be completed prior to final inspection and occupancy of the <br />building(s). <br />Page 13 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.