Laserfiche WebLink
Building Permit Review: <br />50. All conditions of approval for this case shall be reprinted and included as a plan <br />sheet(s) with the building permit plan check sets submitted for review and <br />approval. These conditions of approval shall be on, at all times, all grading and <br />construction plans kept on the project site. It is the responsibility of the building <br />developer to ensure that the project contractor is aware of, and abides by, all <br />conditions of approval. It is the responsibility of the building developer to ensure <br />that the project landscape contractor is aware of, and adheres to, the approved <br />landscape and irrigation plans. Prior approval from the Planning Department <br />must be received before any changes are constituted in site design, grading, <br />building design, building colors or materials, landscape material, etc. <br />51. All building and/or structural plans must comply with all codes and ordinances in <br />effect before the Building and Safety Division will issue permits. <br />52. The project developer shall submit a building survey and/or record of survey and <br />a site development plan in accordance with the provisions of Chapter 18.68 of <br />the Municipal Code of the City of Pleasanton. These plans shall be approved by <br />the Chief Building Official prior to the issuance of a building permit. The site <br />development plan shall include all required information to design and construct <br />site, grading, paving, drainage, and utilities. Specific items to be indicated on the <br />site development plan necessary to construct the improvements are to be in <br />accordance with the City of Pleasanton Private Development Design Guidelines <br />adopted April 15, 1986. <br />53. All retaining walls higher than four-feet from the top of the wall to the bottom of <br />the footway shall be constructed of reinforced concrete or shall be an approved <br />crib wall type. Calculations signed by a registered civil engineer shall <br />accompany the wall plans. <br />54. A sanitary sewer-sampling manhole shall be provided on each of the sanitary <br />sewer lateral from each building, unless otherwise waived by the Chief Building <br />Official. <br />55. The project developer shall submit two copies of the site soils report to the Chief <br />Building Official for third party peer review and shall pay for such review at the <br />time specified by the Director, but in all cases before the issuance of a grading <br />permit. <br />56. The soils engineer shall certify any building pad compactions of all lots containing <br />fill to the satisfaction of the Chief Building Official prior to the issuance of building <br />permits. <br />Page 12 of 21 <br />