Laserfiche WebLink
b. Stanley-First-Sunol. The Stanley Boulevard-First <br /> Street-Sunol Boulevard route from the City's <br /> eastern City limits to and including its <br /> intersection with the 1-680 interchange southbound <br /> off-ramp shall be swept once per week. <br /> <br />c. Other Streets. All streets required to be swept <br /> not included in subsections 3(a) or 3(b) shall be <br /> swept once per month. <br /> <br />d. Parking Lots. All parking lots shall be swept two <br /> times per month. <br /> <br />e. Special Events and Emergency Calls. <br /> <br /> (1) Non-emergency additional sweeping shall be <br /> done as requested by the Director. The <br /> Director shall give at least two (2) days <br /> notice of the time and place additional <br /> sweeping shall be required. Contractor <br /> understands that, due to the nature of <br /> additional sweeping, the exact time and place <br /> may not be able to be described with <br /> particularity and Contractor agrees to use <br /> his best efforts to conform the necessary <br /> additional sweeping to the cleanup purpose <br /> for which the additional sweeping has been <br /> requested. <br /> <br /> (2) The Contractor agrees to respond to emergency <br /> calls for street sweeping from the Director, <br /> the Police Chief, the Fire Chief, and any of <br /> their designees. The Contractor shall <br /> accept, and respond to emergency calls at any <br /> and all times during the day and night every <br /> day during the term of this Agreement. <br /> Response time for emergency calls shall be no <br /> more than two (2) hours. <br /> <br /> f. Within sixty (60) days of the execution of this <br /> Agreement, the contractor shall develop its <br /> sweeping schedule. The sweeping schedule shall be <br /> submitted to the Director as shall any subsequent <br /> change of sweeping schedule. A monthly report <br /> shall be submitted to City Manager stating what <br /> streets were swept and when the sweeping was <br /> completed for each work day of the month. <br /> <br />g. When inclement weather or the observance of a <br /> holiday prevents adherence to the regular sweeping <br /> schedule, the area so affected shall be swept <br /> within the following one week period from the date <br /> of the date of the scheduled sweeping, if <br /> <br /> - 3 - <br /> <br /> <br />