Laserfiche WebLink
possible, without interruption of the regular <br /> sweeping schedule and without additional charge. <br /> <br />4. Manner of Performance. <br /> <br /> a. Clean Condition Required. Areas to be swept shall <br /> be swept by use of a mechanical street sweeper <br /> satisfactory to the Director such that upon <br /> completion curbs, gutters, and other areas <br /> required to be swept are left in a clean <br /> condition. <br /> <br /> (1) A "clean condition" shall be defined as the <br /> absence of residue in the streets and gutters <br /> upon the completion of the sweeping <br /> operation. <br /> <br /> (2) Pre-sweeping large objects and debris (e.g. <br /> manually or otherwise removing for disposal) <br /> shall be done for all objects and debris <br /> incapable of being swept by the mechanical <br /> street sweeper. <br /> <br /> (3) The mechanical street sweeper shall be <br /> operated within the speed range recommended <br /> by its manufacturer for proper sweeping, but <br /> in no event shall it be operated in a manner <br /> so as to leave an area in an unclean <br /> condition. <br /> <br /> (4) Sweeping shall include as many repeated <br /> passes as necessary to leave the swept area <br /> in a clean condition. <br /> <br /> b. Maximum Sweeping Coverage. Sweeping shall be <br /> scheduled to maximize the area of street and/or <br /> parking lot being swept by minimizing interference <br /> by parked vehicles. Sweeping shall be scheduled <br /> and done in such a way as to minimize noise <br /> complaints in residential areas. The Director may <br /> require revisions in the hours and/or manner of <br /> operation as necessary to maximize sweeping <br /> coverage and/or to minimize noise complaints. <br /> <br /> c. Disposal of Debris. The Contractor shall dispose <br /> of all refuse collected by hauling the same to a <br /> legal dump and/or transfer station. The <br /> Contractor shall be responsible for payment of any <br /> and all fees for disposal. <br /> <br />5. Compensation. The City agrees to pay, and Contractor <br /> agrees to accept as full compensation thereto, the <br /> following: <br /> <br /> - 4 - <br /> <br /> <br />