My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
060507
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 12:29:55 PM
Creation date
6/1/2007 8:27:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/5/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br />The tennis courts at Pleasanton Middle School are available for use by the general <br />public after regular school hours and during the summer recess. For some time now, <br />the subject courts have been suffering from surface cracking - a result of unusually <br />expansive sub-soils. This problem, combined with the lack of court lighting, limits use of <br />the courts by Pleasanton residents. With the support of the Pleasanton Unified School <br />District, the City has offered to upgrade the courts, to expand opportunities for public <br />play. <br />A total of three (3) specialty-paving contractors pulled plans for the project, and <br />considered submitting bids; however, at the May 22, 2007 bid opening, a single bid was <br />received from the firm of Vintage Contractors, Inc. of San Francisco. This contractor <br />has worked for the City in the past (Fairlands Park Tennis Court Re-surfacing project), <br />is known to be reputable and reliable, and all bid documents were found to be in order. <br />While only a single bid was received for the project, the Contractor has provided a <br />complete breakdown of all costs associated with the work, and staff is satisfied that the <br />costs for the proposed work are equitable. This project requires conformance to a very <br />strict construction schedule, as work can only be performed during the two-month <br />school summer recess period, between approximately June 15th and August 15th. The <br />Contractor is confident that this schedule can be met, as the lighting materials will be <br />available for immediate installation upon award of the construction contract. <br />Should the Council award this contract, it is anticipated that construction will begin on <br />June 18, 2007, and be completed and ready for public use on August 13, 2007. <br />fitted by: <br />Fiscal Review: <br />Approv by: <br />~.. <br />Nels Fialho <br />City Manager <br />e- ~ ~~ <br />Ja es W. Wol David P. Culver <br />rector of Parks and Director of Finance <br />Community Services <br />Attachments: <br />1. Construction Contract <br />2. Budget Summary <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.