My WebLink
|
Help
|
About
|
Sign Out
RES 07100
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2007
>
RES 07100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2007 4:11:15 PM
Creation date
3/30/2007 4:09:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/20/2007
DOCUMENT NO
RES 07100
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pirnlic•o Drive Torrrout nnrl Pipeline Prgject Environnrentrrl Checklist <br />The 1996 General Plan Update identified growth control measures that will ensure <br />growth occurs in a planned manner so that direct and indirect effects of rapid growth can <br />be minimized or avoided. The City of Pleasanton has adopted a Growth Management <br />Ordinance to plan growth through build out (Chapter ] 7.36) and prepared a Growth <br />Management Plan (1995) to help the City to manage effects of City growth. With long- <br />term planning and growth control measures in place that would avoid or reduce direct or <br />indirect effects of substantial growth in the area under filll build out, the potential for <br />growth inducement associated with the project would be less than significant. <br />b, c) No Impact. No housing units or people will be displaced by the project. <br />13. PUBLIC SERVICES <br />Environmental Setting <br />The City of Pleasanton has public services and infrastructure planned to meet the build out of the <br />General Plan, as implemented by the Growth Management Plan. <br />Standards of Significance <br />For purposes of this environmental document, an impact is considered significant if the proposed <br />project would: <br />• Create an increase in demand for police protection services which could substantially <br />interfere with the ability of the Police Department to provide adequate response time to <br />the project site; <br />• Create an increased demand for I"ire protection services that would substantially interfere <br />with the ability of the Fire Department to provide adequate response time to the project <br />site; <br />• Create an increased demand for schools that would exceed existing school capacity; or, <br />• Create an increased demand for parks and other public Facilities that would exceed <br />existing capacity. <br />ISSUCS <br />Less than <br />Po[entialW Significant with <br />Significant Mitigation <br />Impact Incorporated <br />Less than <br />Significant <br />Impact \o Impact <br />Public Services <br />Would the project: <br />a) Would the project result in substantial adverse <br />physical impacts associated with the provision <br />of new or physically altered governmental <br />facilities, need for new or physically altered <br />governmental facilities, the construction of <br />which could cause significant environmental <br />impacts, in order to maintain acceptable service <br />ratios, response times or other performance <br />City of Pleasanton 43 <br />Draft Initial Study/Proposed Negative Declaration <br />^ ^ <br />^D LJ <br />Winrlcr & Kelly <br />August 2006 <br />042fi3~01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.