My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
032007
>
REGULAR MEETING
>
18 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 1:50:29 PM
Creation date
3/16/2007 2:59:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
18 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
57 Approval of the storm drainage system shall be subject to the review and approval <br />of the City Engineer and Zone 7, as applicable, that the system is adequate, <br />connects to an approved point of discharge, meets any and all applicable <br />requirements of the Alameda County Flood Control District -Zone 7, meets any <br />and all applicable requirements of the Federal Emergency Management Flood <br />Hazard Program, the California Department of Fish and Game, and meets the <br />immediate and long-range requirements of this development and all upstream areas <br />intended to be drained through this development. <br />58 New Electric power distribution, gas distribution, communication service, Cable <br />television, and any required alarm systems shall be installed underground in a joint <br />utility trench unless otherwise specifically approved by the City Engineer or <br />Director of Building Inspection. <br />59 Prior to occupancy of the new construction, the applicant shall enter into a deferred <br />improvement agreement to pay apro-rata share of placing the existing overhead <br />utility lines on Hopyard Road underground unless otherwise specifically approved <br />by the City Engineer. <br />60 Any damage to existing street improvements during construction on the subject <br />property shall be repaired to the satisfaction of the City Engineer at full expense to <br />the developer. This shall include slurry seal, overlay, or street reconstruction if <br />deemed warranted by the City Engineer. <br />61 The applicant's contractor(s) shall obtain an encroachment permit from the City <br />Engineer prior to moving any construction equipment onto the site <br />62 The applicant shall comply with the City's non-point storm drain ordinance. <br />63 Prior to commencement of any clearing, grading, or excavation, the applicant shall <br />submit to the Planning Department a copy of the State Water Resources Control <br />Board Notice of Intent (NOI) for coverage under the State Construction Storm <br />Water General Permit. <br />64 The applicant shall submit a construction Best Management Practice (BMP) <br />program for review and approval by the Planning Director prior to issuance of any <br />building and/or grading permits. These BMP's shall be implemented by the <br />general contractor and all subcontractors and suppliers of materials and equipment. <br />Construction site cleanup and control of construction debris shall also be addressed <br />in this program. Failure to comply with the approved construction BMP may <br />CONDITIONS OF APPROVAL <br />Z-99-212 <br />
The URL can be used to link to this page
Your browser does not support the video tag.