My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
032007
>
REGULAR MEETING
>
18 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 1:50:29 PM
Creation date
3/16/2007 2:59:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
18 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineering <br />50 The applicant shall submit a final grading and drainage plan prepared by a licensed <br />civil engineer depicting all final grades and on-site drainage control measures, <br />including concrete-lined V-ditches, to protect all cut and fill slopes from surface <br />water overflow. This plan shall be subject to the review and approval of the City <br />Engineer and/or the Director of Building Inspection prior to the issuance of any <br />building permits. <br />51 Any existing wells on the site shall be removed or sealed, filled and abandoned <br />pursuant to Alameda County Ord. 73-68, prior to the start of grading operations <br />unless Zone 7 retains specific wells for observation wells, or special approval is <br />obtained from the City Engineer for temporary use of an existing well for <br />construction water. Any wells designated for abandonment or any wells, <br />encountered during construction, are to be destroyed in accordance with a permit <br />obtained from Zone 7. <br />52 All existing septic tanks or holding tanks shall be removed or sealed, filled, and <br />abandoned, pursuant to the requirements of the Alameda County Department of <br />Health Services. <br />53 The haul route for all materials to and from this development shall be approved by <br />the City Engineer prior to the issuance of an encroachment permit. <br />54 The applicant shall include erosion control measures on the final grading plan, <br />subject to the approval of the City Engineer. The applicant is responsible for <br />ensuring that the contractor is aware of such measures. All cut and fill slopes shall <br />be revegetated and stabilized as soon as possible after completion of grading, in no <br />case later than October I5. No grading shall occur beriveen October 15 and April <br />15 unless approved erosion control measures are in place, subject to the approval <br />of the Building Department. Such measures shall be maintained until such time as <br />permanent landscaping is in place. <br />55 The developer shall submit a dust control plan or procedure as part of the <br />improvement plans. <br />56 The design of the water supply and sanitary sewex systems shall be subject to the <br />review and approval of the City Engineer. <br />CONDITIONS OF APPROVAL <br />Z-99-212 <br />
The URL can be used to link to this page
Your browser does not support the video tag.