My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
032007
>
REGULAR MEETING
>
18 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 1:50:29 PM
Creation date
3/16/2007 2:59:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
18 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
result in the issuance of correction notices, citations, or a project stop work order. <br />65 The applicant is responsible for implementing the following measures during all <br />construction phases of the subject project: <br />a.) Gather all construction debris on a regular basis and place them in a dumpster <br />or other container which is emptied or removed on a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that could <br />contribute to storm water pollution. <br />b.) Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement, and storm drains adjoining the project site. During wet weather avoid <br />driving vehicles off paved areas. <br />c.) Broom sweep the public street pavement adjoining the project site on a daily <br />basis. Caked-on mud or dirt shall be scraped from these areas before sweeping. <br />d.) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br />inlet nearest the downstream side of the project site in order to retain any debris or <br />dirt flowing into the City storm drain system. Filter materials shall be maintained <br />and/or replaced as necessary to ensure effectiveness and to prevent street flooding. <br />Dispose of filter particles in the trash. <br />e.) Create a contained and covered area on the site for the storage of bags, cement, <br />paints, flammable, oils, fertilizers, pesticides, or any other materials used on the <br />project site that have the potential for being discharged to the storm drain system <br />through being windblown or in the event of a material spill. <br />f.) Never clean machinery, tools, brushes, etc., or rinse containers into a street, <br />gutter, or storm drain. <br />g.) Ensure that concrete/gunite supply trucks or concrete/plasterers operations do <br />not discharge wash water into street gutters or drains. <br />h.) Construction access routes shall be limited to those approved by the City <br />Engineer or Building Inspector and shall be shown on the approved grading plan. <br />66 The applicant shall install structural control, such as an oil/water separator(s), sand <br />flter, or approved equal in the existing and new parking lot areas to intercept and <br />pretreat storm water prior to reaching the storm drain. The design, locations, and a <br />CONDITIONS OF APPROVAL <br />Z-99-212 <br />
The URL can be used to link to this page
Your browser does not support the video tag.