My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
032007
>
REGULAR MEETING
>
18 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 1:50:29 PM
Creation date
3/16/2007 2:59:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
18 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a future sanctuary expansion to the southwest of the church, and a future freestanding two-story <br />education building located to the north of the sanctuary. The education building was to provide <br />a permanent location for the preschool and a meeting location for Christian study groups. In <br />addition, conditions of approval allowed the modular buildings to remain on site until June 2006 <br />in anticipation of the construction and completion of the education building. This condition was <br />further extended to June 2007. The implementation of this approval relocated 10 parking spaces <br />from the Golden Road/Hopyard Road parking area to the Del Valle Parkway parking area. It <br />reduced parking at the Golden Road area temporarily, increased parking at Del Valley Parkway, <br />and removed the Hopyard Road access to the church facility. The intent has been to relocate the <br />1999 Del Valle Parkway parking spaces back to the Golden Road area as depicted in the 1999 <br />master plan. <br />Trinity Lutheran Church is now ready to complete its final development of the site. The <br />proposed project before the Planning Commission conforms to the 1999 Master Site Plan. <br />The proposed project has conducted significant community outreach by holding two church- <br />sponsored neighborhood meetings, three City-hosted neighborhood meetings, and one workshop <br />with the Planning Commission. Discussions regarding neighborhood meetings and the Planning <br />Commission workshop are found in the later part of this report. <br />This project requires a Conditional Use Permit approval to complete the master plan of the <br />existing facility. Although the proposed building locations are very similar to what was shown <br />in 1999, the 1999 master plan was not part of the Planning Commission action at that time. This <br />project also requires a Design Review approval for the proposed education building and the <br />multiple purpose room, new parking, and landscaping. <br />II. SITE DESCRITION <br />Trinity Lutheran Church is bounded by Del Valle Parkway, Hopyard Road, and Golden Road, <br />on an approximately 3.14-acre parcel. <br />The subject lot is relatively flat. In addition to the buildings, the site has two parking lots, the <br />west parking lot, has access from Golden Road, and the east parking lot, has access from Del <br />Valle Parkway. <br />Located on the adjacent parcel to the west ofthe site is Early Year Daycare which is not <br />affiliated with the church. Trinity Lutheran entered into an agreement for Early Year Day Care <br />to use the drive aisle along with la parking of the church's parking lot on Golden Road during <br />weekdays. This parking area along with the drive aisle is described by an easement for the <br />Case No. PCUP-1 SS/PDR-5l3 Planning Commission <br />Page - 3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.