Laserfiche WebLink
Pimlico Drive Tur~tout and Pipeline Project Environmental Checklist <br />Less than <br />Potentially Signi~can[ with Lcss than <br />Signific:mt JlitigN[ion SiKniticant <br />ISSUCS 1~nPact Incorporated Impact M:Impact <br />objectives for any of the public services <br />Fire protection? ~ ~ X <br />Police protection`? ~ ~ ~X <br />Schools'? ~ ~ ~X <br />Parks? ~ ~ ^X <br />Other public facilities'? ~ ~ ~X <br />lliscussion <br />a) Less than Significant. Construction and operation of the project will not place a demand <br />on fire and police services except in an emergency. Response times for police and fire <br />services would not be substantially affected (temporary construction impacts from traffic <br />lane closures are addressed in Section XV, Transportation). The project will not place <br />additional demands on schools or parks that have not been addressed in the Ucneral Plan <br />Update (1996), General Plan EIR (Mundie and Associates 1996) and public services and <br />infrastnlchlre planned to meet the build out addressed in the City's Growth Management <br />Plan (2002). Construction truck traffic would place ordinary wear and tear on the road, <br />used to and from the Project area. Increases in traffic from operations will be minimal. <br />Therefore, the impact to public services would be less than significant. <br />14. RECREATION <br />Environmental Setting <br />The project is located in a residential and commercial area, and no parks occur on or adjacent to <br />the project. <br />Standards of Significance <br />For purposes of this environmental document, an impact is considered significant if the proposed <br />project would: <br />• Result in the failure to meet City standards for the provision of parkland. <br />City of Pleasanton 44 Winder & Kelly <br />Draft Imttal Study/Proposed Negative Declaration August 2006 <br />04263501 <br />