Laserfiche WebLink
Pimlico Drive Trrrr:otrt and Pipe/ine Project Environmental Checklist <br />vault sites, 8 to 10 at the fluoridation building and 6 to 8 daily at the Santa Rita control valve <br />vault. <br />Equipment delivered to the construction site will include twenty-foot long sections of 20-inch <br />ductile iron pipe, pipe backfill and bedding materials, pre-cast concrete vaults, concrete masonry <br />materials, and mechanical equipment. These materials and equipment will be delivered to the <br />constnuction site by 40-foot (or smaller) flatbed trucks and 10-wheel dump trucks. Assuming <br />pipeline installation advances at about 100 feet per day, approximately 2 to 4 truck trips per day <br />will be required to remove excavated material and deliver backfill material, equipment and <br />materials, asphalt and concrete or 130 to 160 truck trips over the pipeline construction period. <br />A total of approximately 1 to 2 truck trips will be required to deliver materials and equipment to <br />the Pleasanton vault and "Lone 7 turnout site daily or about 10 to 20 trips over the construction <br />period. <br />Equipment and materials delivery to the fluoridation building will be about 10 to 15 truck trips a <br />day or total 15 truck trips over the construction period and 4 to 5 tntck trips to the Santa Rita <br />control valve vault site over a two week period. <br />Two staging areas will be used for materials and equipment. One staging area will be located <br />adjacent to the fluoridation building site and the other will be located in the parking lot adjacent <br />to the Santa Rita control valve vault. Alternate staging areas would be approved by the City of <br />Pleasanton prior to start of construction. <br />Once construction is completed, the roadways, sidewalks, and curves and gutters will be <br />resurfaced and returned to preconstruction conditions. The area around the fluoridation building <br />will be landscaped with ornamental shrubs and vines will be planted along the side of the <br />building facing Pimlico Drive. The area surrounding the Santa Rita control valve vault site <br />disturbed by construction will be landscaped with grass to blend in with the surrounding lawn <br />area. <br />Measures Included in the Project <br />The following is a list and description of measures and standards that have been incorporated <br />into the Project Description in order to avoid or minimize potential environmental impacts. <br />These measures represent standard engineering, design, construction, and maintenance practices. <br />Project Measure AIR-1: Equipment Exhaust Control <br />The City shall control equipment emissions when working within 100 feet of sensitive <br />receptors such as businesses or residences, or when more than three pieces of heavy <br />construction equipment are operating simultaneously. These measures shall include: <br />• The Construction Contractor shall properly maintain construction equipment <br />per manufacturers specifications; <br />• The Construction Contractor shall reduce unnecessary idling of construction <br />equipment (i.e. limit idling time to 10 minutes or less) and avoid staging <br />equipment within 200 feet of sensitive receptors; and <br />City of Pleasanton 10 Winzler & Kelly <br />Draft Initial Study/Proposed Negative Declaration August 2006 <br />04263501 <br />